Today
What's due and what's open.
Due & overdue
Coming up · next 30 days
Exit sign monthly check
Exit sign — main entrance Lithonia LQM · Main lobby
Due 2026-10-04 · in 5 days
Exit sign monthly check
Exit sign — south stair Lithonia LQM · South stair
Due 2026-10-09 · in 10 days
Rounds to walk
Weekly life safety walk
Cedar Ridge Care Center
Overdue3/6 covered
Work orders
Ceiling leak by room 208
Open
Shower chair in 112 wobbles
112
Open
Call light not working in 112
112
Open
Water stain on ceiling tile near 208
Open
PTAC in 205 blowing warm
PTAC — room 205 Amana PTC123G · 205
In progress
Loose handrail outside dining room
A wing corridor
Open
Smoke barrier doors in A wing not latching
Smoke barrier doors — A wing · A wing corridor
Open
Open deficiencies
K761 · Smoke barrier door pair in the A wing corridor: the right leaf does not positively latch when released from the hold-open. Gap at the meeting edge exceeds allowance. Found on the annual fire door inspection.
K761 — Maintenance, Inspection & Testing – Doors
Smoke barrier doors — A wing · A wing corridor
ModerateIn remediation