State assisted-living licensing record · Texas HHSC · record as pulled September 11, 2026· Not the federal nursing home survey
Sunrise Senior Living of Plano
4800 W Parker Rd, Plano, TX 75093 · Collin County · 123 licensed beds
HHSC licence number 149544 · licensed through July 27, 2026 · first licensed July 2006
The licence
Licensed by HHSC · Assisted Living Facility, Type B · LIMITED PARTNERSHIP · managed by Senior Village Management, LLC
Certifications and programs, as listed by HHSC
- Alzheimer's certification
- No
- Alzheimer's unit capacity
- 50
- Accepts Medicaid
- No
Position within Texas
32 citations — more than 99% of the 1,995 licensed assisted living facilities in Texas. Compared only within Texas: a citation from HHSC means what it means in Texas, and there is no national assisted living record to compare to. Counted over 5 years, which holds two or three routine inspections. How this is calculated
Not in this record
Scope and severity, and enforcement. HHSC rates each finding on a scope-and-severity scale but does not publish the rating per facility, and it records fines and enforcement actions separately; neither is republished here. What is here is unusual among states: HHSC inspects fire and life safety itself and publishes those findings per facility, so this record carries a real life safety section.
Get an email about Sunrise Senior Living of Plano
One email when it happens, from the HHSC record as it is pulled each month. No account; stop it any time with one click.
Life safety and building citations
The citations about the building itself — fire and life safety, physical plant and emergency management. Usually the maintenance side’s to fix.
- The facility failed to keep documentation about the fire alarm system onsite at the facility.March 30, 2026
- The facility failed to separate the facility from other occupancies.October 30, 2025
- The facility failed to provide smoke compartmentation where required.October 30, 2025
- The facility failed to provide an approved outdoor area for the segregated unit.October 30, 2025
- The facility failed ensure required means of egress, required means of escape, and required fire protection features were in place and continuously maintained when the building was undergoing construction while occupied.October 30, 2025
- The facility failed to check gas heating systems prior to the heating season and to maintain records of the those checks.October 30, 2025
- The facility failed to ensure corridors met the Life Safety Code.October 30, 2025
- The facility failed to ensure openings between floors were protected to prevent the spread of fire and smoke from one floor to another.October 30, 2025
- The facility failed to include a section addressing warning in the emergency preparedness and response plan.October 30, 2025
- The facility failed to provide the minimum levels of illumination required in the facility.October 30, 2025
- The facility failed to ensure the sensitivity of smoke detectors was checked according to NFPA 72.October 30, 2025
- The facility failed to maintain electrical, heating, and cooling systems so they worked safely.October 30, 2025
- The facility failed to ensure egress routes through living rooms and dining rooms were kept clear of obstructions.October 30, 2025
- The facility failed to ensure means of egress met the referenced codes and standards.October 30, 2025
- The facility failed to include a section addressing transportation in the emergency preparedness and response plan.October 30, 2025
- The facility failed to ensure doors in the facility met the referenced codes and standards.October 30, 2025
- The facility failed to provide required emergency lighting.October 30, 2025
- The facility failed to maintain basic safety features and emergency power during building rehabilitation while the facility was occupied, and without compromising means of egress or means of escape.October 30, 2025
- The facility failed to include a section addressing direction and control in the emergency preparedness and response plan.October 30, 2025
- The facility failed to have and enforce a smoking policy.October 30, 2025
- The facility failed to provide at least two separate stairs between the ground floor and other floors and that all stairs used as a means of egress meet the Life Safety Code.October 30, 2025
- The facility failed to provide proper locking devicesOctober 30, 2025
- The facility failed to include a section addressing health and medical needs in the emergency preparedness and response plan.October 30, 2025
- The facility failed to have a program to inspect, test, and maintain the fire alarm system and keep records of inspection, testing, and maintenance of the fire alarm system.October 30, 2025
- The facility failed to include a section addressing sheltering arrangements in the emergency preparedness and response plan.October 30, 2025
- The facility failed to include a section addressing resource management in the emergency preparedness and response plan.October 30, 2025
- The facility failed to include a section addressing communication in the emergency preparedness and response plan.October 30, 2025
- The facility failed to provide a fire sprinkler system that met the referenced codes and standards.October 30, 2025
- The facility failed to include a section addressing evacuation in the emergency preparedness and response plan.October 30, 2025
- The facility failed to ensure doors to resident rooms and living units could be closed by the occupants.October 30, 2025
- The facility failed to protect cooking operations according to the Life Safety Code.October 30, 2025
- The facility failed to correct a site or building condition that was a fire, health, or physical hazard.October 30, 2025
How that compares
Compared with the median licensed assisted living facility in Texas. Within-state only.
| Measure | Citations |
|---|---|
| This facility | 32 |
| Median facility in Texas | 2 |
Visit history
| Visit | Type | Citations |
|---|---|---|
| October 30, 2025 | life safety code inspection | 31 |
| March 30, 2026 | life safety code inspection | 1 |
| March 31, 2026 | comprehensive inspection | 0 |
What the citations cover
- Life safety 21
- Emergency management 8
- Physical plant 3
| Category | Citations |
|---|---|
| Life safety | 21 |
| Emergency management | 8 |
| Physical plant | 3 |
Every visit on file since September 2021
As published by HHSC, newest first, including visits that cited nothing. The wording is HHSC’s own.
March 31, 2026 — comprehensive inspection, nothing cited
March 30, 2026 — life safety code inspection, 1 citation
| What HHSC found | Corrected |
|---|---|
| The facility failed to keep documentation about the fire alarm system onsite at the facility. | — |
October 30, 2025 — life safety code inspection, 31 citations
Reflects the HHSC record as pulled September 11, 2026. A recent visit may not appear yet. This is the Texas state licensing record; it is not the federal nursing home survey and the two are never combined.