Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

YUKON KUSKOKWIM ELDER'S HOME

BETHEL, AK · 18 certified beds · Last Life Safety survey March 6, 2026

CMS Certification Number 025037 · first certified April 2014

Ownership

Independently operated (no chain recorded by CMS) · Non profit - Corporation

No change of ownership on CMS record since January 1, 2016, when the records begin.

8
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
2
Tags cited more than once
Across separate surveys
4
Inspection & testing records
Of the citations on file

Position within AK

8 citations — more than 11% of the 20 certified nursing homes in AK. Compared within AK rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Improvingfewer citations at the latest survey than at its earlier surveys in the window.

The latest survey found 1 citation; the earlier surveys in the window averaged 3.5. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window opens March 2027 — about 6 months from now. This facility’s last Life Safety survey was March 2026. Nursing homes nationally are typically surveyed 12–17 months after the last one (median 14), measured over 19,385 consecutive surveys in the last two years of CMS records. AK has too few recent surveys to measure on its own, so the national interval is used.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about YUKON KUSKOKWIM ELDER'S HOME

One email when it happens. No account; stop it any time with one click.

Which alerts

1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Physical environment (health survey)

2 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 8 Life Safety citations above. The Physical Environment Index

  • F-0880 Provide and implement an infection prevention and control program.

How that compares

Citations on file over three years

Compared with the median facility in AK, and nationally. Surveyors differ markedly between states, so the AK figure is the meaningful one.

This facility8AK median16National median11
Citations on file over three years, compared
MeasureCitations
This facility8
Median facility in AK16
Median facility nationally11

Survey history

Citations at each Life Safety survey
32023-1242025-0112026-03
Citations at each Life Safety survey
Survey dateCitations
December 15, 20233
January 31, 20254
March 6, 20261

Most-cited tags

Most-cited tags at this facility
K-03532K-02112K-03511K-07121K-05111K-03001
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0353Inspect, test, and maintain automatic sprinkler systems.22026-03-06
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.22025-01-31
K-0351Install an approved automatic sprinkler system.12025-01-31
K-0712Have simulated fire drills held at unexpected times.12025-01-31
K-0511Have properly installed electrical wiring and gas equipment.12023-12-15
K-0300Meet other general requirements that are deficient.12025-01-31

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 3
  • Egress Deficiencies 3
  • Services Deficiencies 1
  • Miscellaneous Deficiencies 1
Citations by CMS category
CategoryCitations
Smoke Deficiencies3
Egress Deficiencies3
Services Deficiencies1
Miscellaneous Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

March 6, 2026 — 1 citation

Citations issued on March 6, 2026
TagWhat the surveyor checksStatus
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (March 20, 2026)

January 31, 2025 — 4 citations

Citations issued on January 31, 2025
TagWhat the surveyor checksStatus
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (February 27, 2025)
K-0300Meet other general requirements that are deficient.Deficient, Provider has date of correction (February 27, 2025)
K-0351Install an approved automatic sprinkler system.Deficient, Provider has date of correction (February 27, 2025)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (February 27, 2025)

December 15, 2023 — 3 citations

Citations issued on December 15, 2023
TagWhat the surveyor checksStatus
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (February 29, 2024)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (February 29, 2024)
K-0511Have properly installed electrical wiring and gas equipment.Deficient, Provider has date of correction (February 29, 2024)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.