Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
ARBOR LAKE HEALTH AND REHAB
AUBURN, AL · 87 certified beds · Last Life Safety survey August 9, 2023
CMS Certification Number 015452 · first certified July 2004
Ownership
Operated by TRAYLOR PORTER HEALTHCARE · For profit - Limited Liability company
- Ownership changed November 9, 2022 (change of ownership)to SOUTHERN STATES BANK from THE EAST ALABAMA HEALTH CARE AUTHORITY
Position within AL
14 citations — more than 79% of the 224 certified nursing homes in AL. Compared within AL rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 5 citations; the earlier surveys in the window averaged 4.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
Well past the typical window (August 2024 to January 2025), and past the point by which nine in ten US facilities have been surveyed. This facility’s last Life Safety survey was August 2023. Nursing homes nationally are typically surveyed 12–17 months after the last one (median 14), measured over 19,385 consecutive surveys in the last two years of CMS records. AL has too few recent surveys to measure on its own, so the national interval is used.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about ARBOR LAKE HEALTH AND REHAB
One email when it happens. No account; stop it any time with one click.
2 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Physical environment (health survey)
2 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 14 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in AL, and nationally. Surveyors differ markedly between states, so the AL figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 14 |
| Median facility in AL | 9 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| July 25, 2019 | 9 |
| April 29, 2022 | 0 |
| August 9, 2023 | 5 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0324 | Provide properly protected cooking facilities. | 2 | 2023-08-09 |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | 2 | 2023-08-09 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 1 | 2023-08-09 |
| K-0363 | Install corridor and hallway doors that block smoke. | 1 | 2019-07-25 |
| K-0232 | Have corridors or aisles that are unobstructed and are at least 8 feet in width. | 1 | 2019-07-25 |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 1 | 2023-08-09 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 1 | 2019-07-25 |
| K-0131 | Meet requirements for sections of health care facilities separated by fire resistive construction. | 1 | 2023-08-09 |
What the citations cover
- Smoke Deficiencies 8
- Gas, Vacuum, and Electrical Systems Deficiencies 3
- Egress Deficiencies 1
- Construction Deficiencies 1
- Other 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 8 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 3 |
| Egress Deficiencies | 1 |
| Construction Deficiencies | 1 |
| Miscellaneous Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
August 9, 2023 — 5 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0131 | Meet requirements for sections of health care facilities separated by fire resistive construction. | Deficient, Provider has date of correction (September 15, 2023) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (September 15, 2023) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (September 15, 2023) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (September 15, 2023) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (September 15, 2023) |
July 25, 2019 — 9 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0232 | Have corridors or aisles that are unobstructed and are at least 8 feet in width. | Deficient, Provider has date of correction (September 3, 2019) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (September 3, 2019) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (September 3, 2019) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (September 3, 2019) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (September 3, 2019) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (September 3, 2019) |
| K-0711 | Provide a written emergency evacuation plan. | Deficient, Provider has date of correction (September 3, 2019) |
| K-0914 | Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing. | Deficient, Provider has date of correction (September 3, 2019) |
| K-0921 | Ensure that testing and maintenance of electrical equipment is performed. | Deficient, Provider has date of correction (September 3, 2019) |