Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

THE PINE OF CAMDEN, LLC

CAMDEN, AL · 95 certified beds · Last Life Safety survey March 18, 2021

CMS Certification Number 015374 · first certified October 1980

Ownership

Independently operated (no chain recorded by CMS) · For profit - Corporation

  • New ownershipOwnership changed October 1, 2024 (change of ownership)to THE PINES OF CAMDEN LLC from CAMDEN NURSING FACILITY INC
14
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
3
Tags cited more than once
Across separate surveys
7
Inspection & testing records
Of the citations on file

Position within AL

14 citations — more than 79% of the 224 certified nursing homes in AL. Compared within AL rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Holding steadyabout the same at the latest survey as at its earlier surveys in the window.

The latest survey found 5 citations; the earlier surveys in the window averaged 4.5. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

Well past the typical window (March 2022 to August 2022), and past the point by which nine in ten US facilities have been surveyed. This facility’s last Life Safety survey was March 2021. Nursing homes nationally are typically surveyed 12–17 months after the last one (median 14), measured over 19,385 consecutive surveys in the last two years of CMS records. AL has too few recent surveys to measure on its own, so the national interval is used.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about THE PINE OF CAMDEN, LLC

One email when it happens. No account; stop it any time with one click.

Which alerts

2 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Emergency preparedness

1 of the 14 citations on file is Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

Physical environment (health survey)

1 physical-environment citation on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 14 Life Safety citations above. The Physical Environment Index

  • F-0880 Provide and implement an infection prevention and control program.

How that compares

Citations on file over three years

Compared with the median facility in AL, and nationally. Surveyors differ markedly between states, so the AL figure is the meaningful one.

This facility14AL median9National median11
Citations on file over three years, compared
MeasureCitations
This facility14
Median facility in AL9
Median facility nationally11

Survey history

Citations at each Life Safety survey
62018-0132019-0152021-03
Citations at each Life Safety survey
Survey dateCitations
January 11, 20186
January 31, 20193
March 18, 20215

Most-cited tags

Most-cited tags at this facility
K-02932K-03632K-03532E-00411K-03451K-03431K-02321K-09181
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0293Have properly located and lighted "Exit" signs.22019-01-31
K-0363Install corridor and hallway doors that block smoke.22021-03-18
K-0353Inspect, test, and maintain automatic sprinkler systems.22019-01-31
E-0041Implement emergency and standby power systems.12021-03-18
K-0345Have approved installation, maintenance and testing program for fire alarm systems.12021-03-18
K-0343Have a fire alarm with audible and visual signals that transmits the alarm automatically to notify emergency forces in event of fire.12018-01-11
K-0232Have corridors or aisles that are unobstructed and are at least 8 feet in width.12021-03-18
K-0918Have generator or other power source capable of supplying service within 10 seconds.12018-01-11

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 7
  • Egress Deficiencies 3
  • Gas, Vacuum, and Electrical Systems Deficiencies 3
  • Emergency Preparedness Deficiencies 1
Citations by CMS category
CategoryCitations
Smoke Deficiencies7
Egress Deficiencies3
Gas, Vacuum, and Electrical Systems Deficiencies3
Emergency Preparedness Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

March 18, 2021 — 5 citations

Citations issued on March 18, 2021
TagWhat the surveyor checksStatus
E-0041Implement emergency and standby power systems.Deficient, Provider has date of correction (April 25, 2021)
K-0232Have corridors or aisles that are unobstructed and are at least 8 feet in width.Deficient, Provider has date of correction (April 25, 2021)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (April 25, 2021)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (April 25, 2021)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (April 25, 2021)

January 31, 2019 — 3 citations

Citations issued on January 31, 2019
TagWhat the surveyor checksStatus
K-0293Have properly located and lighted "Exit" signs.Deficient, Provider has date of correction (March 12, 2019)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (March 12, 2019)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (March 12, 2019)

January 11, 2018 — 6 citations

Citations issued on January 11, 2018
TagWhat the surveyor checksStatus
K-0293Have properly located and lighted "Exit" signs.Deficient, Provider has date of correction (February 28, 2018)
K-0343Have a fire alarm with audible and visual signals that transmits the alarm automatically to notify emergency forces in event of fire.Deficient, Provider has date of correction (February 28, 2018)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (February 28, 2018)
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.Deficient, Provider has date of correction (February 28, 2018)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (February 28, 2018)
K-0921Ensure that testing and maintenance of electrical equipment is performed.Deficient, Provider has date of correction (February 28, 2018)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.