Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

HENDRIX HEALTH AND REHABILITATION

DOUBLE SPRINGS, AL · 110 certified beds · Last Life Safety survey September 7, 2023

CMS Certification Number 015138 · first certified October 1979

Ownership

Independently operated (no chain recorded by CMS) · For profit - Individual

No change of ownership on CMS record since January 1, 2016, when the records begin.

13
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
1
Tags cited more than once
Across separate surveys
6
Inspection & testing records
Of the citations on file

Position within AL

13 citations — more than 73% of the 224 certified nursing homes in AL. Compared within AL rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Slippingmore citations at the latest survey than at its earlier surveys in the window.

The latest survey found 6 citations; the earlier surveys in the window averaged 3.5. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

Well past the typical window (September 2024 to February 2025), and past the point by which nine in ten US facilities have been surveyed. This facility’s last Life Safety survey was September 2023. Nursing homes nationally are typically surveyed 12–17 months after the last one (median 14), measured over 19,385 consecutive surveys in the last two years of CMS records. AL has too few recent surveys to measure on its own, so the national interval is used.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about HENDRIX HEALTH AND REHABILITATION

One email when it happens. No account; stop it any time with one click.

Which alerts

Emergency preparedness

2 of the 13 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

Physical environment (health survey)

1 physical-environment citation on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 13 Life Safety citations above. The Physical Environment Index

  • F-0880 Provide and implement an infection prevention and control program.

How that compares

Citations on file over three years

Compared with the median facility in AL, and nationally. Surveyors differ markedly between states, so the AL figure is the meaningful one.

This facility13AL median9National median11
Citations on file over three years, compared
MeasureCitations
This facility13
Median facility in AL9
Median facility nationally11

Survey history

Citations at each Life Safety survey
52018-0922019-1062023-09
Citations at each Life Safety survey
Survey dateCitations
September 12, 20185
October 29, 20192
September 7, 20236

Most-cited tags

Most-cited tags at this facility
K-02932K-09231E-00091E-00251K-03531K-02811K-05111K-03211
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0293Have properly located and lighted "Exit" signs.22023-09-07
K-0923Have proper medical gas storage and administration areas.12023-09-07
E-0009Include a process for Emergency Preparedness collaboration.12023-09-07
E-0025Create arrangements with other facilities to receive patients.12023-09-07
K-0353Inspect, test, and maintain automatic sprinkler systems.12023-09-07
K-0281Install proper backup exit lighting.12018-09-12
K-0511Have properly installed electrical wiring and gas equipment.12018-09-12
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.12018-09-12

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 5
  • Egress Deficiencies 4
  • Emergency Preparedness Deficiencies 2
  • Gas, Vacuum, and Electrical Systems Deficiencies 1
  • Other 1
Citations by CMS category
CategoryCitations
Smoke Deficiencies5
Egress Deficiencies4
Emergency Preparedness Deficiencies2
Gas, Vacuum, and Electrical Systems Deficiencies1
Services Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

September 7, 2023 — 6 citations

Citations issued on September 7, 2023
TagWhat the surveyor checksStatus
E-0009Include a process for Emergency Preparedness collaboration.Deficient, Provider has date of correction (October 18, 2023)
E-0025Create arrangements with other facilities to receive patients.Deficient, Provider has date of correction (October 18, 2023)
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (October 18, 2023)
K-0293Have properly located and lighted "Exit" signs.Deficient, Provider has date of correction (October 18, 2023)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (October 18, 2023)
K-0923Have proper medical gas storage and administration areas.Deficient, Provider has date of correction (October 18, 2023)

October 29, 2019 — 2 citations

Citations issued on October 29, 2019
TagWhat the surveyor checksStatus
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (November 21, 2019)
K-0355Properly select, install, inspect, or maintain portable fire extinguishes.Deficient, Provider has date of correction (November 21, 2019)

September 12, 2018 — 5 citations

Citations issued on September 12, 2018
TagWhat the surveyor checksStatus
K-0281Install proper backup exit lighting.Deficient, Provider has date of correction (October 23, 2018)
K-0293Have properly located and lighted "Exit" signs.Deficient, Provider has date of correction (October 23, 2018)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (October 23, 2018)
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.Deficient, Provider has date of correction (October 23, 2018)
K-0511Have properly installed electrical wiring and gas equipment.Deficient, Provider has date of correction (October 23, 2018)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.