Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
CAMELLIA HEALTH AND REHABILITATION CENTER
MOBILE, AL · 170 certified beds · Last Life Safety survey January 7, 2022
CMS Certification Number 015151 · first certified January 1977
Ownership
Operated by ARABELLA HEALTHCARE MANAGEMENT · For profit - Limited Liability company
- Ownership changed June 20, 2023 (change of ownership)to ARABELLA HEALTH & WELLNESS OF MOBILE from AZALEA HEALTH AND REHAB LLC
Position within AL
19 citations — more than 92% of the 224 certified nursing homes in AL. Compared within AL rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 8 citations; the earlier surveys in the window averaged 5.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
Well past the typical window (January 2023 to June 2023), and past the point by which nine in ten US facilities have been surveyed. This facility’s last Life Safety survey was January 2022. Nursing homes nationally are typically surveyed 12–17 months after the last one (median 14), measured over 19,385 consecutive surveys in the last two years of CMS records. AL has too few recent surveys to measure on its own, so the national interval is used.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about CAMELLIA HEALTH AND REHABILITATION CENTER
One email when it happens. No account; stop it any time with one click.
3 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
1 of the 19 citations on file is Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
2 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 19 Life Safety citations above. The Physical Environment Index
- F-0880 Provide and implement an infection prevention and control program.
How that compares
Compared with the median facility in AL, and nationally. Surveyors differ markedly between states, so the AL figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 19 |
| Median facility in AL | 9 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| April 12, 2018 | 7 |
| May 2, 2019 | 4 |
| January 7, 2022 | 8 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0712 | Have simulated fire drills held at unexpected times. | 3 | 2022-01-07 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 2 | 2019-05-02 |
| K-0363 | Install corridor and hallway doors that block smoke. | 2 | 2022-01-07 |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | 1 | 2018-04-12 |
| K-0923 | Have proper medical gas storage and administration areas. | 1 | 2018-04-12 |
| K-0311 | Have an enclosure around a vertical opening shaft. | 1 | 2022-01-07 |
| K-0325 | Have properly installed hallway dispensers for alcohol-based hand rub. | 1 | 2022-01-07 |
| K-0531 | Have elevators that firefighters can control in the event of a fire. | 1 | 2019-05-02 |
What the citations cover
- Smoke Deficiencies 9
- Gas, Vacuum, and Electrical Systems Deficiencies 3
- Miscellaneous Deficiencies 3
- Services Deficiencies 2
- Other 2
| Category | Citations |
|---|---|
| Smoke Deficiencies | 9 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 3 |
| Miscellaneous Deficiencies | 3 |
| Services Deficiencies | 2 |
| Emergency Preparedness Deficiencies | 1 |
| Construction Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
January 7, 2022 — 8 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0161 | Use approved construction type or materials. | Waiver has been granted (September 1, 2023) |
| K-0311 | Have an enclosure around a vertical opening shaft. | Deficient, Provider has date of correction (February 15, 2022) |
| K-0325 | Have properly installed hallway dispensers for alcohol-based hand rub. | Deficient, Provider has date of correction (February 15, 2022) |
| K-0362 | Ensure that corridors are separated from use areas by walls constructed to limit the passage of smoke. | Deficient, Provider has date of correction (February 15, 2022) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (February 15, 2022) |
| K-0371 | Have properly sized and located compartments to protect residents from smoke. | Deficient, Provider has date of correction (February 15, 2022) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (February 15, 2022) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (February 15, 2022) |
May 2, 2019 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (May 5, 2019) |
| K-0531 | Have elevators that firefighters can control in the event of a fire. | Deficient, Provider has date of correction (May 16, 2019) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (May 17, 2019) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (May 16, 2019) |
April 12, 2018 — 7 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0039 | Conduct testing and exercise requirements. | Deficient, Provider has date of correction (May 3, 2018) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (April 18, 2018) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (May 3, 2018) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (April 18, 2018) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (May 3, 2018) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (May 3, 2018) |
| K-0923 | Have proper medical gas storage and administration areas. | Deficient, Provider has date of correction (April 26, 2018) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.