Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
SOUTH HAMPTON NURSING & REHABILITATION CENTER
OWENS CROSS ROADS, AL · 81 certified beds · Last Life Safety survey July 14, 2023
CMS Certification Number 015448 · first certified June 2002
Ownership
Operated by PRESTON HEALTH SERVICES · For profit - Limited Liability company
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within AL
11 citations — more than 58% of the 224 certified nursing homes in AL. Compared within AL rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 6 citations; the earlier surveys in the window averaged 2.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
Well past the typical window (July 2024 to December 2024), and past the point by which nine in ten US facilities have been surveyed. This facility’s last Life Safety survey was July 2023. Nursing homes nationally are typically surveyed 12–17 months after the last one (median 14), measured over 19,385 consecutive surveys in the last two years of CMS records. AL has too few recent surveys to measure on its own, so the national interval is used.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about SOUTH HAMPTON NURSING & REHABILITATION CENTER
One email when it happens. No account; stop it any time with one click.
3 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Physical environment (health survey)
1 physical-environment citation on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 11 Life Safety citations above. The Physical Environment Index
- F-0880 Provide and implement an infection prevention and control program.
How that compares
Compared with the median facility in AL, and nationally. Surveyors differ markedly between states, so the AL figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 11 |
| Median facility in AL | 9 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| August 9, 2018 | 2 |
| September 5, 2019 | 3 |
| July 14, 2023 | 6 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0363 | Install corridor and hallway doors that block smoke. | 2 | 2023-07-14 |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 2 | 2023-07-14 |
| K-0226 | Have horizontal exits used in accordance with safety requirements. | 2 | 2023-07-14 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 2 | 2023-07-14 |
| K-0324 | Provide properly protected cooking facilities. | 1 | 2019-09-05 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 1 | 2023-07-14 |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | 1 | 2023-07-14 |
What the citations cover
- Smoke Deficiencies 8
- Egress Deficiencies 2
- Gas, Vacuum, and Electrical Systems Deficiencies 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 8 |
| Egress Deficiencies | 2 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
July 14, 2023 — 6 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0226 | Have horizontal exits used in accordance with safety requirements. | Deficient, Provider has date of correction (July 27, 2023) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (July 27, 2023) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (July 27, 2023) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (July 27, 2023) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (July 27, 2023) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (July 27, 2023) |
September 5, 2019 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0226 | Have horizontal exits used in accordance with safety requirements. | Deficient, Provider has date of correction (October 1, 2019) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (October 1, 2019) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (October 1, 2019) |
August 9, 2018 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (August 20, 2018) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (September 14, 2018) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.