Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

THE BLOSSOMS AT PRESCOTT REHAB & NURSING CENTER

PRESCOTT, AR · 111 certified beds · Last Life Safety survey April 16, 2026

CMS Certification Number 045470 · first certified March 2020

Ownership

Operated by THE BLOSSOMS REHAB & NURSING CENTER · For profit - Limited Liability company

  • Ownership changed August 1, 2024 (change of ownership)from SOUTHERN PINES HEALTH OPCO LLC
10
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
2
Tags cited more than once
Across separate surveys
5
Inspection & testing records
Of the citations on file

Position within AR

10 citations — more than 85% of the 221 certified nursing homes in AR. Compared within AR rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Holding steadyabout the same at the latest survey as at its earlier surveys in the window.

The latest survey found 3 citations; the earlier surveys in the window averaged 3.5. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window opens April 2027 — about 7 months from now. This facility’s last Life Safety survey was April 2026. Facilities in AR are typically surveyed 12–17 months after the last one (median 15), measured over 307 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about THE BLOSSOMS AT PRESCOTT REHAB & NURSING CENTER

One email when it happens. No account; stop it any time with one click.

Which alerts

1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Physical environment (health survey)

3 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 10 Life Safety citations above. The Physical Environment Index

  • F-0880 Provide and implement an infection prevention and control program.
  • F-0921 Make sure that the nursing home area is safe, easy to use, clean and comfortable for residents, staff and the public.

How that compares

Citations on file over three years

Compared with the median facility in AR, and nationally. Surveyors differ markedly between states, so the AR figure is the meaningful one.

This facility10AR median5National median11
Citations on file over three years, compared
MeasureCitations
This facility10
Median facility in AR5
Median facility nationally11

Survey history

Citations at each Life Safety survey
42023-1132024-1032026-04
Citations at each Life Safety survey
Survey dateCitations
November 22, 20234
October 31, 20243
April 16, 20263

Most-cited tags

Most-cited tags at this facility
K-05213K-03472K-07121K-03411K-03631K-03211K-02231
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0521Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions.32026-04-16
K-0347Properly provide smoke detection systems in areas open to corridors.22026-04-16
K-0712Have simulated fire drills held at unexpected times.12023-11-22
K-0341Install a fire alarm system that can be heard throughout the facility.12026-04-16
K-0363Install corridor and hallway doors that block smoke.12024-10-31
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.12023-11-22
K-0223Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector.12024-10-31

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 5
  • Services Deficiencies 3
  • Egress Deficiencies 1
  • Miscellaneous Deficiencies 1
Citations by CMS category
CategoryCitations
Smoke Deficiencies5
Services Deficiencies3
Egress Deficiencies1
Miscellaneous Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

April 16, 2026 — 3 citations

Citations issued on April 16, 2026
TagWhat the surveyor checksStatus
K-0341Install a fire alarm system that can be heard throughout the facility.Deficient, Provider has date of correction (April 24, 2026)
K-0347Properly provide smoke detection systems in areas open to corridors.Deficient, Provider has date of correction (April 24, 2026)
K-0521Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions.Deficient, Provider has date of correction (April 24, 2026)

October 31, 2024 — 3 citations

Citations issued on October 31, 2024
TagWhat the surveyor checksStatus
K-0223Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector.Deficient, Provider has date of correction (November 29, 2024)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (November 29, 2024)
K-0521Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions.Deficient, Provider has date of correction (October 28, 2024)

November 22, 2023 — 4 citations

Citations issued on November 22, 2023
TagWhat the surveyor checksStatus
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (December 22, 2023)
K-0347Properly provide smoke detection systems in areas open to corridors.Deficient, Provider has date of correction (December 22, 2023)
K-0521Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions.Waiver has been granted (January 2, 2024)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (December 22, 2023)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.