Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
THE BLOSSOMS AT ROGERS REHAB & NURSING CENTER
ROGERS, AR · 110 certified beds · Last Life Safety survey January 8, 2026
CMS Certification Number 045212 · first certified June 1993
Ownership
Operated by THE BLOSSOMS REHAB & NURSING CENTER · For profit - Limited Liability company
- Ownership changed April 5, 2021 (change of ownership)from THE WATERS OF ROGERS, LLC
Position within AR
8 citations — more than 71% of the 221 certified nursing homes in AR. Compared within AR rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 2 citations; the earlier surveys in the window averaged 3. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens January 2027 — about 4 months from now. This facility’s last Life Safety survey was January 2026. Facilities in AR are typically surveyed 12–17 months after the last one (median 15), measured over 307 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about THE BLOSSOMS AT ROGERS REHAB & NURSING CENTER
One email when it happens. No account; stop it any time with one click.
Emergency preparedness
1 of the 8 citations on file is Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
3 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 8 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in AR, and nationally. Surveyors differ markedly between states, so the AR figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 8 |
| Median facility in AR | 5 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| September 29, 2022 | 2 |
| December 22, 2023 | 4 |
| January 8, 2026 | 2 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0347 | Properly provide smoke detection systems in areas open to corridors. | 2 | 2026-01-08 |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | 1 | 2023-12-22 |
| K-0351 | Install an approved automatic sprinkler system. | 1 | 2022-09-29 |
| K-0923 | Have proper medical gas storage and administration areas. | 1 | 2026-01-08 |
| E-0031 | Provide emergency officials' contact information. | 1 | 2023-12-22 |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 1 | 2022-09-29 |
| K-0344 | Have an alternate power supply for its alarm system. | 1 | 2023-12-22 |
What the citations cover
- Smoke Deficiencies 5
- Services Deficiencies 1
- Emergency Preparedness Deficiencies 1
- Gas, Vacuum, and Electrical Systems Deficiencies 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 5 |
| Services Deficiencies | 1 |
| Emergency Preparedness Deficiencies | 1 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
January 8, 2026 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0347 | Properly provide smoke detection systems in areas open to corridors. | Deficient, Provider has date of correction (January 28, 2026) |
| K-0923 | Have proper medical gas storage and administration areas. | Deficient, Provider has date of correction (January 28, 2026) |
December 22, 2023 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0031 | Provide emergency officials' contact information. | Deficient, Provider has date of correction (January 31, 2024) |
| K-0344 | Have an alternate power supply for its alarm system. | Deficient, Provider has date of correction (January 31, 2024) |
| K-0347 | Properly provide smoke detection systems in areas open to corridors. | Deficient, Provider has date of correction (January 31, 2024) |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Waiver has been granted (December 19, 2023) |
September 29, 2022 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (October 26, 2022) |
| K-0351 | Install an approved automatic sprinkler system. | Deficient, Provider has date of correction (October 26, 2022) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.