Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

CITADEL POST ACUTE

MESA, AZ · 128 certified beds · Last Life Safety survey February 21, 2025

CMS Certification Number 035103 · first certified March 1985

Ownership

Operated by THE ENSIGN GROUP · For profit - Corporation

No change of ownership on CMS record since January 1, 2016, when the records begin.

7
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
2
Tags cited more than once
Across separate surveys
6
Inspection & testing records
Of the citations on file

Position within AZ

7 citations — more than 48% of the 140 certified nursing homes in AZ. Compared within AZ rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Improvingfewer citations at the latest survey than at its earlier surveys in the window.

The latest survey found 0 citations; the earlier surveys in the window averaged 3.5. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window is open now: April 2026 to December 2026. This facility’s last Life Safety survey was February 2025. Facilities in AZ are typically surveyed 14–22 months after the last one (median 18), measured over 143 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about CITADEL POST ACUTE

One email when it happens. No account; stop it any time with one click.

Which alerts

2 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Emergency preparedness

1 of the 7 citations on file is Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

Physical environment (health survey)

1 physical-environment citation on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 7 Life Safety citations above. The Physical Environment Index

  • F-0880 Provide and implement an infection prevention and control program.

How that compares

Citations on file over three years

Compared with the median facility in AZ, and nationally. Surveyors differ markedly between states, so the AZ figure is the meaningful one.

This facility7AZ median8National median11
Citations on file over three years, compared
MeasureCitations
This facility7
Median facility in AZ8
Median facility nationally11

Survey history

Citations at each Life Safety survey
42022-0232023-0402025-02
Citations at each Life Safety survey
Survey dateCitations
February 17, 20224
April 14, 20233
February 21, 20250

Most-cited tags

Most-cited tags at this facility
K-03632K-05112K-03551K-05211E-00041
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0363Install corridor and hallway doors that block smoke.22023-04-14
K-0511Have properly installed electrical wiring and gas equipment.22023-04-14
K-0355Properly select, install, inspect, or maintain portable fire extinguishes.12022-02-17
K-0521Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions.12022-02-17
E-0004Develop and maintain an Emergency Preparedness Program (EP).12023-04-14

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 3
  • Services Deficiencies 3
  • Emergency Preparedness Deficiencies 1
Citations by CMS category
CategoryCitations
Smoke Deficiencies3
Services Deficiencies3
Emergency Preparedness Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

April 14, 2023 — 3 citations

Citations issued on April 14, 2023
TagWhat the surveyor checksStatus
E-0004Develop and maintain an Emergency Preparedness Program (EP).Deficient, Provider has date of correction (May 19, 2023)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (May 19, 2023)
K-0511Have properly installed electrical wiring and gas equipment.Deficient, Provider has date of correction (May 19, 2023)

February 17, 2022 — 4 citations

Citations issued on February 17, 2022
TagWhat the surveyor checksStatus
K-0355Properly select, install, inspect, or maintain portable fire extinguishes.Deficient, Provider has date of correction (March 9, 2022)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (March 9, 2022)
K-0511Have properly installed electrical wiring and gas equipment.Deficient, Provider has date of correction (March 9, 2022)
K-0521Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions.Deficient, Provider has date of correction (March 9, 2022)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.