Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
BOSWELL TRANSITIONAL CARE OF CASCADIA
SUN CITY, AZ · 115 certified beds · Last Life Safety survey May 9, 2025
CMS Certification Number 035121 · first certified December 1985
Ownership
Operated by CASCADIA HEALTHCARE · For profit - Limited Liability company
- Ownership changed August 1, 2022 (change of ownership)from BANNER BOSWELL MEDICAL CENTER
Position within AZ
6 citations — more than 41% of the 140 certified nursing homes in AZ. Compared within AZ rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 1 citation; the earlier surveys in the window averaged 2.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window is open now: July 2026 to March 2027. This facility’s last Life Safety survey was May 2025. Facilities in AZ are typically surveyed 14–22 months after the last one (median 18), measured over 143 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about BOSWELL TRANSITIONAL CARE OF CASCADIA
One email when it happens. No account; stop it any time with one click.
1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
How that compares
Compared with the median facility in AZ, and nationally. Surveyors differ markedly between states, so the AZ figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 6 |
| Median facility in AZ | 8 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| March 17, 2022 | 4 |
| March 23, 2023 | 1 |
| May 9, 2025 | 1 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0363 | Install corridor and hallway doors that block smoke. | 2 | 2025-05-09 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 1 | 2022-03-17 |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | 1 | 2022-03-17 |
| K-0511 | Have properly installed electrical wiring and gas equipment. | 1 | 2022-03-17 |
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | 1 | 2023-03-23 |
What the citations cover
- Smoke Deficiencies 4
- Egress Deficiencies 1
- Services Deficiencies 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 4 |
| Egress Deficiencies | 1 |
| Services Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
May 9, 2025 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (June 19, 2025) |
March 23, 2023 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (May 25, 2023) |
March 17, 2022 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (April 14, 2022) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (April 14, 2022) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (April 14, 2022) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (April 14, 2022) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.