Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
BAY VIEW REHABILITATION HOSPITAL, LLC
ALAMEDA, CA · 180 certified beds · Last Life Safety survey January 20, 2026
CMS Certification Number 056348 · first certified August 1972
Ownership
Operated by DAVID JOHNSON · For profit - Limited Liability company
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within CA
34 citations — more than 90% of the 1,165 certified nursing homes in CA. Compared within CA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 3 citations; the earlier surveys in the window averaged 10.3. With 4 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens January 2027 — about 4 months from now. This facility’s last Life Safety survey was January 2026. Facilities in CA are typically surveyed 12–18 months after the last one (median 14), measured over 1,766 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about BAY VIEW REHABILITATION HOSPITAL, LLC
One email when it happens. No account; stop it any time with one click.
5 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
5 of the 34 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
5 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 34 Life Safety citations above. The Physical Environment Index
- F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
- F-0921 Make sure that the nursing home area is safe, easy to use, clean and comfortable for residents, staff and the public.
- F-0880 Provide and implement an infection prevention and control program.
- F-0908 Keep all essential equipment working safely.
How that compares
Compared with the median facility in CA, and nationally. Surveyors differ markedly between states, so the CA figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 34 |
| Median facility in CA | 19 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| March 29, 2019 | 14 |
| June 24, 2021 | 6 |
| October 31, 2024 | 11 |
| January 20, 2026 | 3 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 3 | 2024-10-31 |
| K-0363 | Install corridor and hallway doors that block smoke. | 3 | 2024-10-31 |
| K-0161 | Use approved construction type or materials. | 3 | 2024-10-31 |
| K-0919 | Meet requirements for the use of electrical equipment. | 2 | 2024-10-31 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 2 | 2024-10-31 |
| E-0015 | Address subsistence needs for staff and patients. | 2 | 2026-01-20 |
| K-0324 | Provide properly protected cooking facilities. | 2 | 2024-10-31 |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 2 | 2024-10-31 |
What the citations cover
- Smoke Deficiencies 16
- Emergency Preparedness Deficiencies 5
- Gas, Vacuum, and Electrical Systems Deficiencies 4
- Services Deficiencies 3
- Other 6
| Category | Citations |
|---|---|
| Smoke Deficiencies | 16 |
| Emergency Preparedness Deficiencies | 5 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 4 |
| Services Deficiencies | 3 |
| Construction Deficiencies | 3 |
| Miscellaneous Deficiencies | 3 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
January 20, 2026 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0015 | Address subsistence needs for staff and patients. | Deficient, Provider has date of correction (January 30, 2026) |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Deficient, Provider has date of correction (February 6, 2026) |
| K-0741 | Have posted "No-smoking" signs in areas where smoking is not permitted or ashtrays provided where smoking was allowed. | Deficient, Provider has date of correction (January 30, 2026) |
October 31, 2024 — 11 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0161 | Use approved construction type or materials. | Deficient, Provider has date of correction (November 30, 2024) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (November 30, 2024) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (November 30, 2024) |
| K-0342 | Have a complete alarm system manually initiated and initiated by fire sprinkler system connection. | Deficient, Provider has date of correction (November 30, 2024) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (November 30, 2024) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (November 30, 2024) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (November 30, 2024) |
| K-0711 | Provide a written emergency evacuation plan. | Deficient, Provider has date of correction (November 30, 2024) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (November 30, 2024) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (November 30, 2024) |
| K-0919 | Meet requirements for the use of electrical equipment. | Deficient, Provider has date of correction (November 30, 2024) |
June 24, 2021 — 6 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0018 | Establish procedures for tracking staff and patients during an emergency. | Deficient, Provider has date of correction (July 26, 2021) |
| E-0032 | Provide primary/alternate means for communication. | Deficient, Provider has date of correction (July 26, 2021) |
| K-0161 | Use approved construction type or materials. | Deficient, Provider has date of correction (July 26, 2021) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (July 26, 2021) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (July 26, 2021) |
| K-0919 | Meet requirements for the use of electrical equipment. | Deficient, Provider has date of correction (July 26, 2021) |
March 29, 2019 — 14 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0015 | Address subsistence needs for staff and patients. | Deficient, Provider has date of correction (July 1, 2019) |
| E-0026 | Establish roles under a Waiver declared by secretary. | Deficient, Provider has date of correction (July 1, 2019) |
| K-0161 | Use approved construction type or materials. | Deficient, Provider has date of correction (July 1, 2019) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (July 1, 2019) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (July 1, 2019) |
| K-0346 | Follow proper procedures when the fire alarm was out of service for more than 4 hours. | Deficient, Provider has date of correction (July 1, 2019) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (July 1, 2019) |
| K-0354 | Follow proper procedures when the automatic sprinkler systems was out of service for more than 10 hours. | Deficient, Provider has date of correction (July 1, 2019) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (July 1, 2019) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (July 1, 2019) |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | Deficient, Provider has date of correction (July 1, 2019) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (July 1, 2019) |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Deficient, Provider has date of correction (July 1, 2019) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (July 1, 2019) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.