Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
AUBURN RAVINE HEALTHCARE CENTER
AUBURN, CA · 59 certified beds · Last Life Safety survey September 10, 2025
CMS Certification Number 555645 · first certified November 1995
Also on this campus
The same campus holds a state-licensed assisted living facility, with its own state record on the Assisted Living Index: Auburn Ravine Terrace Assisted Living (750 Auburn Ravine RD). Matched by the telephone number the two records share. The records are separate and are never added together.
Ownership
Operated by CYPRESS HEALTHCARE GROUP · For profit - Limited Liability company
- Ownership changed February 29, 2024 (change of ownership)from CONGREGATIONAL CHURCH RETIREMENT COMMUNITY
Position within CA
17 citations — more than 38% of the 1,165 certified nursing homes in CA. Compared within CA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 7 citations; the earlier surveys in the window averaged 5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window is open now: September 2026 to March 2027. This facility’s last Life Safety survey was September 2025. Facilities in CA are typically surveyed 12–18 months after the last one (median 14), measured over 1,766 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about AUBURN RAVINE HEALTHCARE CENTER
One email when it happens. No account; stop it any time with one click.
2 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
1 of the 17 citations on file is Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
6 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 17 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in CA, and nationally. Surveyors differ markedly between states, so the CA figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 17 |
| Median facility in CA | 19 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| September 8, 2023 | 3 |
| July 19, 2024 | 7 |
| September 10, 2025 | 7 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0363 | Install corridor and hallway doors that block smoke. | 2 | 2025-09-10 |
| K-0711 | Provide a written emergency evacuation plan. | 2 | 2025-09-10 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 2 | 2024-07-19 |
| K-0920 | Ensure proper usage of power strips and extension cords. | 2 | 2025-09-10 |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 1 | 2023-09-08 |
| K-0223 | Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector. | 1 | 2025-09-10 |
| K-0161 | Use approved construction type or materials. | 1 | 2024-07-19 |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | 1 | 2025-09-10 |
What the citations cover
- Smoke Deficiencies 6
- Gas, Vacuum, and Electrical Systems Deficiencies 4
- Miscellaneous Deficiencies 3
- Egress Deficiencies 2
- Other 2
| Category | Citations |
|---|---|
| Smoke Deficiencies | 6 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 4 |
| Miscellaneous Deficiencies | 3 |
| Egress Deficiencies | 2 |
| Construction Deficiencies | 1 |
| Emergency Preparedness Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
September 10, 2025 — 7 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (September 30, 2025) |
| K-0223 | Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector. | Deficient, Provider has date of correction (September 30, 2025) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (September 29, 2025) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (September 29, 2025) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (September 30, 2025) |
| K-0711 | Provide a written emergency evacuation plan. | Deficient, Provider has date of correction (September 29, 2025) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (September 30, 2025) |
July 19, 2024 — 7 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0039 | Conduct testing and exercise requirements. | Deficient, Provider has date of correction (August 12, 2024) |
| K-0161 | Use approved construction type or materials. | Deficient, Provider has date of correction (August 12, 2024) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (August 12, 2024) |
| K-0711 | Provide a written emergency evacuation plan. | Deficient, Provider has date of correction (August 12, 2024) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (August 12, 2024) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (August 12, 2024) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (August 12, 2024) |
September 8, 2023 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (September 25, 2023) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (September 25, 2023) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (September 25, 2023) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.