Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
CHAPARRAL HOUSE
BERKELEY, CA · 49 certified beds · Last Life Safety survey September 27, 2024
CMS Certification Number 555872 · first certified July 2011
Ownership
Independently operated (no chain recorded by CMS) · Non profit - Corporation
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within CA
33 citations — more than 89% of the 1,165 certified nursing homes in CA. Compared within CA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 4 citations; the earlier surveys in the window averaged 9.7. With 4 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
Past the typical window (October 2025 to March 2026). Most CA facilities have been surveyed by February 2027. This facility’s last Life Safety survey was September 2024. Facilities in CA are typically surveyed 12–18 months after the last one (median 14), measured over 1,766 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about CHAPARRAL HOUSE
One email when it happens. No account; stop it any time with one click.
5 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
10 of the 33 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
2 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 33 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in CA, and nationally. Surveyors differ markedly between states, so the CA figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 33 |
| Median facility in CA | 19 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| June 12, 2019 | 11 |
| April 20, 2023 | 16 |
| December 21, 2023 | 2 |
| September 27, 2024 | 4 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 3 | 2024-09-27 |
| K-0363 | Install corridor and hallway doors that block smoke. | 2 | 2023-04-20 |
| E-0041 | Implement emergency and standby power systems. | 2 | 2023-04-20 |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 2 | 2024-09-27 |
| E-0004 | Develop and maintain an Emergency Preparedness Program (EP). | 2 | 2023-04-20 |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | 2 | 2024-09-27 |
| K-0919 | Meet requirements for the use of electrical equipment. | 2 | 2024-09-27 |
| K-0161 | Use approved construction type or materials. | 2 | 2023-04-20 |
What the citations cover
- Smoke Deficiencies 14
- Emergency Preparedness Deficiencies 10
- Gas, Vacuum, and Electrical Systems Deficiencies 4
- Miscellaneous Deficiencies 2
- Other 3
| Category | Citations |
|---|---|
| Smoke Deficiencies | 14 |
| Emergency Preparedness Deficiencies | 10 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 4 |
| Miscellaneous Deficiencies | 2 |
| Construction Deficiencies | 2 |
| Services Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
September 27, 2024 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (October 8, 2024) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (October 8, 2024) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (October 8, 2024) |
| K-0919 | Meet requirements for the use of electrical equipment. | Deficient, Provider has date of correction (October 8, 2024) |
December 21, 2023 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (January 17, 2024) |
| K-0711 | Provide a written emergency evacuation plan. | Deficient, Provider has date of correction (January 17, 2024) |
April 20, 2023 — 16 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0004 | Develop and maintain an Emergency Preparedness Program (EP). | Deficient, Provider has date of correction (May 15, 2023) |
| E-0013 | Develop Emergency Preparedness policies and procedures. | Deficient, Provider has date of correction (May 15, 2023) |
| E-0029 | Develop a communication plan. | Deficient, Provider has date of correction (May 15, 2023) |
| E-0036 | Establish emergency prep training and testing. | Deficient, Provider has date of correction (May 15, 2023) |
| E-0037 | Establish staff and initial training requirements. | Deficient, Provider has date of correction (May 15, 2023) |
| E-0041 | Implement emergency and standby power systems. | Deficient, Provider has date of correction (May 15, 2023) |
| K-0161 | Use approved construction type or materials. | Deficient, Provider has date of correction (May 15, 2023) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (May 15, 2023) |
| K-0342 | Have a complete alarm system manually initiated and initiated by fire sprinkler system connection. | Deficient, Provider has date of correction (May 15, 2023) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (May 15, 2023) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (May 15, 2023) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (May 15, 2023) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (May 15, 2023) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (May 15, 2023) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (May 15, 2023) |
| K-0919 | Meet requirements for the use of electrical equipment. | Deficient, Provider has date of correction (May 15, 2023) |
June 12, 2019 — 11 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0004 | Develop and maintain an Emergency Preparedness Program (EP). | Deficient, Provider has date of correction (August 12, 2019) |
| E-0015 | Address subsistence needs for staff and patients. | Deficient, Provider has date of correction (August 12, 2019) |
| E-0032 | Provide primary/alternate means for communication. | Deficient, Provider has date of correction (August 12, 2019) |
| E-0041 | Implement emergency and standby power systems. | Deficient, Provider has date of correction (August 12, 2019) |
| K-0161 | Use approved construction type or materials. | Deficient, Provider has date of correction (August 12, 2019) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (August 12, 2019) |
| K-0343 | Have a fire alarm with audible and visual signals that transmits the alarm automatically to notify emergency forces in event of fire. | Deficient, Provider has date of correction (August 12, 2019) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (August 12, 2019) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (August 12, 2019) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (August 12, 2019) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (August 12, 2019) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.