Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
CALIFORNIA PARK POST ACUTE
CHICO, CA · 90 certified beds · Last Life Safety survey June 22, 2026
CMS Certification Number 555625 · first certified March 1995
Ownership
Operated by KALESTA HEALTHCARE GROUP · For profit - Corporation
- New ownershipOwnership changed June 1, 2025 (change of ownership)from CHICO REHABILITATION HOSPITAL, LLC
Position within CA
24 citations — more than 67% of the 1,165 certified nursing homes in CA. Compared within CA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 4 citations; the earlier surveys in the window averaged 6.7. With 4 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens June 2027 — about 9 months from now. This facility’s last Life Safety survey was June 2026. Facilities in CA are typically surveyed 12–18 months after the last one (median 14), measured over 1,766 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about CALIFORNIA PARK POST ACUTE
One email when it happens. No account; stop it any time with one click.
3 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Physical environment (health survey)
2 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 24 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in CA, and nationally. Surveyors differ markedly between states, so the CA figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 24 |
| Median facility in CA | 19 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| June 24, 2022 | 5 |
| October 20, 2023 | 8 |
| March 13, 2025 | 7 |
| June 22, 2026 | 4 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 3 | 2025-03-13 |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 2 | 2026-06-22 |
| K-0347 | Properly provide smoke detection systems in areas open to corridors. | 2 | 2023-10-20 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 2 | 2025-03-13 |
| K-0920 | Ensure proper usage of power strips and extension cords. | 2 | 2025-03-13 |
| K-0919 | Meet requirements for the use of electrical equipment. | 2 | 2025-03-13 |
| K-0223 | Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector. | 1 | 2022-06-24 |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | 1 | 2026-06-22 |
What the citations cover
- Smoke Deficiencies 12
- Gas, Vacuum, and Electrical Systems Deficiencies 6
- Egress Deficiencies 3
- Construction Deficiencies 1
- Other 2
| Category | Citations |
|---|---|
| Smoke Deficiencies | 12 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 6 |
| Egress Deficiencies | 3 |
| Construction Deficiencies | 1 |
| Miscellaneous Deficiencies | 1 |
| Services Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
June 22, 2026 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0342 | Have a complete alarm system manually initiated and initiated by fire sprinkler system connection. | Deficient, Provider has no plan of correction |
| K-0343 | Have a fire alarm with audible and visual signals that transmits the alarm automatically to notify emergency forces in event of fire. | Deficient, Provider has no plan of correction |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has no plan of correction |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | Deficient, Provider has no plan of correction |
March 13, 2025 — 7 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (April 10, 2025) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (April 10, 2025) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (April 10, 2025) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (April 10, 2025) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (April 10, 2025) |
| K-0919 | Meet requirements for the use of electrical equipment. | Deficient, Provider has date of correction (April 10, 2025) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (April 10, 2025) |
October 20, 2023 — 8 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0161 | Use approved construction type or materials. | Deficient, Provider has date of correction (November 15, 2023) |
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (November 15, 2023) |
| K-0347 | Properly provide smoke detection systems in areas open to corridors. | Deficient, Provider has date of correction (November 15, 2023) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (November 15, 2023) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (November 15, 2023) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (November 15, 2023) |
| K-0919 | Meet requirements for the use of electrical equipment. | Deficient, Provider has date of correction (November 15, 2023) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (November 15, 2023) |
June 24, 2022 — 5 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0223 | Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector. | Deficient, Provider has date of correction (July 11, 2022) |
| K-0293 | Have properly located and lighted "Exit" signs. | Deficient, Provider has date of correction (July 11, 2022) |
| K-0347 | Properly provide smoke detection systems in areas open to corridors. | Deficient, Provider has date of correction (July 11, 2022) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (July 11, 2022) |
| K-0531 | Have elevators that firefighters can control in the event of a fire. | Deficient, Provider has date of correction (July 11, 2022) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.