Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
HARVEST CROSSING POST ACUTE
MANTECA, CA · 99 certified beds · Last Life Safety survey March 12, 2026
CMS Certification Number 055917 · first certified April 1968
Ownership
Operated by KALESTA HEALTHCARE GROUP · For profit - Limited Liability company
- Ownership changed November 1, 2021 (change of ownership)from PALM HAVEN NURSING & REHAB LLC
Position within CA
30 citations — more than 85% of the 1,165 certified nursing homes in CA. Compared within CA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 11 citations; the earlier surveys on file averaged 9.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens March 2027 — about 4 months from now. This facility’s last Life Safety survey was March 2026. Facilities in CA are typically surveyed 12–16 months after the last one (median 14), measured over 1,814 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to about three years in Virginia. How the window is measured
Get an email about HARVEST CROSSING POST ACUTE
One email when it happens. No account; stop it any time with one click.
4 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities cited for sprinkler inspection and testing in CMS’s current file are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
9 of the 30 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
8 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 30 Life Safety citations above. The Physical Environment Index
- F-0880 Provide and implement an infection prevention and control program.
- F-0922 Have enough backup water supply for essential areas of the nursing home.
- F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
- F-0919 Make sure that a working call system is available in each resident's bathroom and bathing area.
How that compares
Compared with the median facility in CA, and nationally. Surveyors differ markedly between states, so the CA figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 30 |
| Median facility in CA | 19 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| November 9, 2023 | 13 |
| November 21, 2024 | 6 |
| March 12, 2026 | 11 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0363 | Install corridor and hallway doors that block smoke. | 3 | 2026-03-12 |
| K-0342 | Have a complete alarm system manually initiated and initiated by fire sprinkler system connection. | 3 | 2026-03-12 |
| K-0920 | Ensure proper usage of power strips and extension cords. | 3 | 2026-03-12 |
| K-0712 | Have simulated fire drills held at unexpected times. | 2 | 2026-03-12 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 2 | 2026-03-12 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 2 | 2026-03-12 |
| E-0039 | Conduct testing and exercise requirements. | 2 | 2026-03-12 |
| K-0293 | Have properly located and lighted "Exit" signs. | 1 | 2024-11-21 |
What the citations cover
- Smoke Deficiencies 11
- Emergency Preparedness Deficiencies 9
- Gas, Vacuum, and Electrical Systems Deficiencies 7
- Miscellaneous Deficiencies 2
- Other 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 11 |
| Emergency Preparedness Deficiencies | 9 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 7 |
| Miscellaneous Deficiencies | 2 |
| Egress Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
March 12, 2026 — 11 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0039 | Conduct testing and exercise requirements. | Deficient, Provider has date of correction (April 18, 2026) |
| K-0342 | Have a complete alarm system manually initiated and initiated by fire sprinkler system connection. | Deficient, Provider has date of correction (April 3, 2026) |
| K-0346 | Follow proper procedures when the fire alarm was out of service for more than 4 hours. | Deficient, Provider has date of correction (April 3, 2026) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (April 18, 2026) |
| K-0354 | Follow proper procedures when the automatic sprinkler systems was out of service for more than 10 hours. | Deficient, Provider has date of correction (April 3, 2026) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (April 3, 2026) |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | Deficient, Provider has date of correction (April 3, 2026) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (April 18, 2026) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (April 18, 2026) |
| K-0919 | Meet requirements for the use of electrical equipment. | Deficient, Provider has date of correction (April 3, 2026) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (April 3, 2026) |
November 21, 2024 — 6 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0293 | Have properly located and lighted "Exit" signs. | Deficient, Provider has date of correction (December 31, 2024) |
| K-0342 | Have a complete alarm system manually initiated and initiated by fire sprinkler system connection. | Deficient, Provider has date of correction (December 31, 2024) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (December 31, 2024) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (December 31, 2024) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (December 31, 2024) |
| K-0923 | Have proper medical gas storage and administration areas. | Deficient, Provider has date of correction (December 31, 2024) |
November 9, 2023 — 13 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0004 | Develop and maintain an Emergency Preparedness Program (EP). | Deficient, Provider has date of correction (December 28, 2023) |
| E-0006 | Conduct risk assessment and an All-Hazards approach. | Deficient, Provider has date of correction (December 28, 2023) |
| E-0013 | Develop Emergency Preparedness policies and procedures. | Deficient, Provider has date of correction (December 28, 2023) |
| E-0029 | Develop a communication plan. | Deficient, Provider has date of correction (December 28, 2023) |
| E-0036 | Establish emergency prep training and testing. | Deficient, Provider has date of correction (December 28, 2023) |
| E-0037 | Establish staff and initial training requirements. | Deficient, Provider has date of correction (December 28, 2023) |
| E-0039 | Conduct testing and exercise requirements. | Deficient, Provider has date of correction (December 28, 2023) |
| E-0041 | Implement emergency and standby power systems. | Deficient, Provider has date of correction (December 28, 2023) |
| K-0342 | Have a complete alarm system manually initiated and initiated by fire sprinkler system connection. | Deficient, Provider has date of correction (December 28, 2023) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (December 28, 2023) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (December 28, 2023) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (December 28, 2023) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (December 28, 2023) |
Reflects the CMS posting of October 1, 2026. Surveys conducted in the last few months may not appear yet.