SEQUOIA TRANSITIONAL CARE
PORTERVILLE, CA · 99 certified beds · Last Life Safety survey January 15, 2026
CMS Certification Number 055551 · first certified February 1978
Ownership
Operated by PACS GROUP · For profit - Limited Liability company
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within CA
12 citations — more than 17% of the 1,165 certified nursing homes in CA. Compared within CA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 4 citations; the earlier surveys in the window averaged 4. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens January 2027 — about 4 months from now. This facility’s last Life Safety survey was January 2026. Facilities in CA are typically surveyed 12–18 months after the last one (median 14), measured over 1,766 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about SEQUOIA TRANSITIONAL CARE
One email when it happens. No account; stop it any time with one click.
1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
2 of the 12 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
4 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 12 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in CA, and nationally. Surveyors differ markedly between states, so the CA figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 12 |
| Median facility in CA | 19 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| October 12, 2023 | 3 |
| January 9, 2025 | 5 |
| January 15, 2026 | 4 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 3 | 2026-01-15 |
| K-0346 | Follow proper procedures when the fire alarm was out of service for more than 4 hours. | 1 | 2026-01-15 |
| E-0024 | Establish policies and procedures for volunteers. | 1 | 2025-01-09 |
| E-0041 | Implement emergency and standby power systems. | 1 | 2023-10-12 |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 1 | 2026-01-15 |
| K-0923 | Have proper medical gas storage and administration areas. | 1 | 2025-01-09 |
| K-0161 | Use approved construction type or materials. | 1 | 2023-10-12 |
| K-0920 | Ensure proper usage of power strips and extension cords. | 1 | 2025-01-09 |
What the citations cover
- Gas, Vacuum, and Electrical Systems Deficiencies 5
- Smoke Deficiencies 3
- Emergency Preparedness Deficiencies 2
- Egress Deficiencies 1
- Other 1
| Category | Citations |
|---|---|
| Gas, Vacuum, and Electrical Systems Deficiencies | 5 |
| Smoke Deficiencies | 3 |
| Emergency Preparedness Deficiencies | 2 |
| Egress Deficiencies | 1 |
| Construction Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
January 15, 2026 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (February 12, 2026) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (February 12, 2026) |
| K-0346 | Follow proper procedures when the fire alarm was out of service for more than 4 hours. | Deficient, Provider has date of correction (February 12, 2026) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has plan of correction |
January 9, 2025 — 5 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0024 | Establish policies and procedures for volunteers. | Deficient, Provider has date of correction (January 30, 2025) |
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (January 24, 2025) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Waiver has been granted (January 30, 2025) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (January 24, 2025) |
| K-0923 | Have proper medical gas storage and administration areas. | Deficient, Provider has date of correction (January 24, 2025) |
October 12, 2023 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0041 | Implement emergency and standby power systems. | Deficient, Provider has date of correction (November 2, 2023) |
| K-0161 | Use approved construction type or materials. | Deficient, Provider has date of correction (November 2, 2023) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Waiver has been granted (November 2, 2023) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.