Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
MARQUIS CARE AT SHASTA
REDDING, CA · 180 certified beds · Last Life Safety survey March 5, 2026
CMS Certification Number 056222 · first certified July 1970
Ownership
Operated by MARQUIS COMPANIES · For profit - Corporation
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within CA
19 citations — more than 47% of the 1,165 certified nursing homes in CA. Compared within CA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 7 citations; the earlier surveys in the window averaged 6. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens March 2027 — about 5 months from now. This facility’s last Life Safety survey was March 2026. Facilities in CA are typically surveyed 12–18 months after the last one (median 14), measured over 1,766 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about MARQUIS CARE AT SHASTA
One email when it happens. No account; stop it any time with one click.
2 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
2 of the 19 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
2 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 19 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in CA, and nationally. Surveyors differ markedly between states, so the CA figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 19 |
| Median facility in CA | 19 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| January 12, 2023 | 7 |
| October 10, 2024 | 5 |
| March 5, 2026 | 7 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0920 | Ensure proper usage of power strips and extension cords. | 3 | 2026-03-05 |
| K-0919 | Meet requirements for the use of electrical equipment. | 2 | 2026-03-05 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 2 | 2026-03-05 |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 2 | 2026-03-05 |
| K-0161 | Use approved construction type or materials. | 1 | 2023-01-12 |
| K-0712 | Have simulated fire drills held at unexpected times. | 1 | 2026-03-05 |
| K-0347 | Properly provide smoke detection systems in areas open to corridors. | 1 | 2024-10-10 |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | 1 | 2026-03-05 |
What the citations cover
- Gas, Vacuum, and Electrical Systems Deficiencies 8
- Smoke Deficiencies 7
- Emergency Preparedness Deficiencies 2
- Construction Deficiencies 1
- Other 1
| Category | Citations |
|---|---|
| Gas, Vacuum, and Electrical Systems Deficiencies | 8 |
| Smoke Deficiencies | 7 |
| Emergency Preparedness Deficiencies | 2 |
| Construction Deficiencies | 1 |
| Miscellaneous Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
March 5, 2026 — 7 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0342 | Have a complete alarm system manually initiated and initiated by fire sprinkler system connection. | Deficient, Provider has date of correction (March 20, 2026) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (March 27, 2026) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (March 20, 2026) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (March 20, 2026) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (April 6, 2026) |
| K-0919 | Meet requirements for the use of electrical equipment. | Deficient, Provider has date of correction (March 24, 2026) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (March 20, 2026) |
October 10, 2024 — 5 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (November 10, 2024) |
| K-0343 | Have a fire alarm with audible and visual signals that transmits the alarm automatically to notify emergency forces in event of fire. | Deficient, Provider has date of correction (November 10, 2024) |
| K-0347 | Properly provide smoke detection systems in areas open to corridors. | Deficient, Provider has date of correction (November 10, 2024) |
| K-0919 | Meet requirements for the use of electrical equipment. | Deficient, Provider has date of correction (November 10, 2024) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (November 10, 2024) |
January 12, 2023 — 7 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0034 | Provide a means of sharing information on occupancy/needs. | Deficient, Provider has date of correction (February 13, 2023) |
| E-0035 | Provide family notifications of emergency plan. | Deficient, Provider has date of correction (February 13, 2023) |
| K-0161 | Use approved construction type or materials. | Deficient, Provider has date of correction (February 13, 2023) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (February 13, 2023) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (February 13, 2023) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (February 13, 2023) |
| K-0923 | Have proper medical gas storage and administration areas. | Deficient, Provider has date of correction (February 13, 2023) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.