Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
College Oak Nursing and Rehabilitation Center
Sacramento, CA · 120 certified beds · Last Life Safety survey April 9, 2026
CMS Certification Number 056158 · first certified February 1970
Ownership
Operated by CYPRESS HEALTHCARE GROUP · For profit - Limited Liability company
- Ownership changed March 20, 2019 (change of ownership)to COLLEGE OAKS NURSING AND REHABILITATION CENTER from C.O.N.R., INC.
Position within CA
14 citations — more than 26% of the 1,165 certified nursing homes in CA. Compared within CA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 6 citations; the earlier surveys in the window averaged 4. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens April 2027 — about 7 months from now. This facility’s last Life Safety survey was April 2026. Facilities in CA are typically surveyed 12–18 months after the last one (median 14), measured over 1,766 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about College Oak Nursing and Rehabilitation Center
One email when it happens. No account; stop it any time with one click.
3 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Physical environment (health survey)
2 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 14 Life Safety citations above. The Physical Environment Index
- F-0880 Provide and implement an infection prevention and control program.
How that compares
Compared with the median facility in CA, and nationally. Surveyors differ markedly between states, so the CA figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 14 |
| Median facility in CA | 19 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| February 9, 2024 | 3 |
| February 7, 2025 | 5 |
| April 9, 2026 | 6 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 3 | 2026-04-09 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 2 | 2025-02-07 |
| K-0363 | Install corridor and hallway doors that block smoke. | 2 | 2026-04-09 |
| K-0711 | Provide a written emergency evacuation plan. | 1 | 2025-02-07 |
| K-0161 | Use approved construction type or materials. | 1 | 2025-02-07 |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 1 | 2024-02-09 |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 1 | 2026-04-09 |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | 1 | 2026-04-09 |
What the citations cover
- Smoke Deficiencies 9
- Gas, Vacuum, and Electrical Systems Deficiencies 3
- Miscellaneous Deficiencies 1
- Construction Deficiencies 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 9 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 3 |
| Miscellaneous Deficiencies | 1 |
| Construction Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
April 9, 2026 — 6 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (April 24, 2026) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (April 24, 2026) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (April 24, 2026) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (April 24, 2026) |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | Deficient, Provider has date of correction (April 24, 2026) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (April 24, 2026) |
February 7, 2025 — 5 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0161 | Use approved construction type or materials. | Deficient, Provider has date of correction (February 21, 2025) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (February 21, 2025) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (February 21, 2025) |
| K-0711 | Provide a written emergency evacuation plan. | Deficient, Provider has date of correction (February 21, 2025) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (February 21, 2025) |
February 9, 2024 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (February 27, 2024) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (February 27, 2024) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (February 27, 2024) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.