Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
University Post-Acute Rehab
Sacramento, CA · 59 certified beds · Last Life Safety survey May 22, 2025
CMS Certification Number 555265 · first certified June 1987
Ownership
Operated by ASPEN SKILLED HEALTHCARE · For profit - Corporation
- Ownership changed February 1, 2023 (change of ownership)from V S N F INC
Position within CA
24 citations — more than 67% of the 1,165 certified nursing homes in CA. Compared within CA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 4 citations; the earlier surveys in the window averaged 10. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window is open now: May 2026 to November 2026. This facility’s last Life Safety survey was May 2025. Facilities in CA are typically surveyed 12–18 months after the last one (median 14), measured over 1,766 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about University Post-Acute Rehab
One email when it happens. No account; stop it any time with one click.
2 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
4 of the 24 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
3 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 24 Life Safety citations above. The Physical Environment Index
- F-0880 Provide and implement an infection prevention and control program.
How that compares
Compared with the median facility in CA, and nationally. Surveyors differ markedly between states, so the CA figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 24 |
| Median facility in CA | 19 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| January 13, 2022 | 4 |
| June 6, 2024 | 16 |
| May 22, 2025 | 4 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0920 | Ensure proper usage of power strips and extension cords. | 3 | 2025-05-22 |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | 2 | 2024-06-06 |
| E-0039 | Conduct testing and exercise requirements. | 2 | 2025-05-22 |
| E-0030 | List the names and contact information of those in the facility. | 2 | 2024-06-06 |
| K-0919 | Meet requirements for the use of electrical equipment. | 2 | 2025-05-22 |
| K-0363 | Install corridor and hallway doors that block smoke. | 2 | 2025-05-22 |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | 1 | 2024-06-06 |
| K-0347 | Properly provide smoke detection systems in areas open to corridors. | 1 | 2024-06-06 |
What the citations cover
- Smoke Deficiencies 11
- Gas, Vacuum, and Electrical Systems Deficiencies 6
- Emergency Preparedness Deficiencies 4
- Miscellaneous Deficiencies 2
- Other 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 11 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 6 |
| Emergency Preparedness Deficiencies | 4 |
| Miscellaneous Deficiencies | 2 |
| Egress Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
May 22, 2025 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0039 | Conduct testing and exercise requirements. | Deficient, Provider has date of correction (June 12, 2025) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (June 10, 2025) |
| K-0919 | Meet requirements for the use of electrical equipment. | Deficient, Provider has date of correction (June 10, 2025) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (June 10, 2025) |
June 6, 2024 — 16 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0030 | List the names and contact information of those in the facility. | Deficient, Provider has date of correction (June 27, 2024) |
| E-0039 | Conduct testing and exercise requirements. | Deficient, Provider has date of correction (June 27, 2024) |
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (June 27, 2024) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (June 27, 2024) |
| K-0346 | Follow proper procedures when the fire alarm was out of service for more than 4 hours. | Deficient, Provider has date of correction (June 27, 2024) |
| K-0347 | Properly provide smoke detection systems in areas open to corridors. | Deficient, Provider has date of correction (June 27, 2024) |
| K-0351 | Install an approved automatic sprinkler system. | Deficient, Provider has date of correction (June 27, 2024) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (June 27, 2024) |
| K-0354 | Follow proper procedures when the automatic sprinkler systems was out of service for more than 10 hours. | Deficient, Provider has date of correction (June 27, 2024) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (June 27, 2024) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (June 27, 2024) |
| K-0711 | Provide a written emergency evacuation plan. | Deficient, Provider has date of correction (June 27, 2024) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (June 27, 2024) |
| K-0919 | Meet requirements for the use of electrical equipment. | Deficient, Provider has date of correction (June 27, 2024) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (June 27, 2024) |
| K-0921 | Ensure that testing and maintenance of electrical equipment is performed. | Deficient, Provider has date of correction (June 27, 2024) |
January 13, 2022 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0030 | List the names and contact information of those in the facility. | Deficient, Provider has date of correction (January 31, 2022) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (January 31, 2022) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (January 31, 2022) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (January 31, 2022) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.