Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

SEQUOIAS SAN FRANCISCO CONVALESCENT HOSPITAL

SAN FRANCISCO, CA · 50 certified beds · Last Life Safety survey February 17, 2026

CMS Certification Number 056071 · first certified June 1969

Also on this campus

The same campus holds a state-licensed assisted living facility, with its own state record on the Assisted Living Index: Sequoias San Francisco (THE) (1400 Geary Blvd). Matched by the telephone number the two records share. The records are separate and are never added together.

Ownership

Independently operated (no chain recorded by CMS) · Non profit - Corporation

No change of ownership on CMS record since January 1, 2016, when the records begin.

26
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
6
Tags cited more than once
Across separate surveys
12
Inspection & testing records
Of the citations on file

Position within CA

26 citations — more than 74% of the 1,165 certified nursing homes in CA. Compared within CA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Improvingfewer citations at the latest survey than at its earlier surveys in the window.

The latest survey found 7 citations; the earlier surveys in the window averaged 9.5. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window opens February 2027 — about 5 months from now. This facility’s last Life Safety survey was February 2026. Facilities in CA are typically surveyed 12–18 months after the last one (median 14), measured over 1,766 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about SEQUOIAS SAN FRANCISCO CONVALESCENT HOSPITAL

One email when it happens. No account; stop it any time with one click.

Which alerts

2 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Emergency preparedness

2 of the 26 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

Physical environment (health survey)

4 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 26 Life Safety citations above. The Physical Environment Index

  • F-0908 Keep all essential equipment working safely.
  • F-0921 Make sure that the nursing home area is safe, easy to use, clean and comfortable for residents, staff and the public.
  • F-0925 Make sure there is a pest control program to prevent/deal with mice, insects, or other pests.
  • F-0880 Provide and implement an infection prevention and control program.

How that compares

Citations on file over three years

Compared with the median facility in CA, and nationally. Surveyors differ markedly between states, so the CA figure is the meaningful one.

This facility26CA median19National median11
Citations on file over three years, compared
MeasureCitations
This facility26
Median facility in CA19
Median facility nationally11

Survey history

Citations at each Life Safety survey
102023-0592024-1172026-02
Citations at each Life Safety survey
Survey dateCitations
May 12, 202310
November 22, 20249
February 17, 20267

Most-cited tags

Most-cited tags at this facility
K-07123K-01612K-09192K-03442K-07112K-02912K-09201K-03551
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0712Have simulated fire drills held at unexpected times.32026-02-17
K-0161Use approved construction type or materials.22024-11-22
K-0919Meet requirements for the use of electrical equipment.22026-02-17
K-0344Have an alternate power supply for its alarm system.22026-02-17
K-0711Provide a written emergency evacuation plan.22026-02-17
K-0291Install emergency lighting that can last at least 1 1/2 hours.22024-11-22
K-0920Ensure proper usage of power strips and extension cords.12023-05-12
K-0355Properly select, install, inspect, or maintain portable fire extinguishes.12023-05-12

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 8
  • Gas, Vacuum, and Electrical Systems Deficiencies 5
  • Miscellaneous Deficiencies 5
  • Egress Deficiencies 3
  • Other 5
Citations by CMS category
CategoryCitations
Smoke Deficiencies8
Gas, Vacuum, and Electrical Systems Deficiencies5
Miscellaneous Deficiencies5
Egress Deficiencies3
Construction Deficiencies2
Emergency Preparedness Deficiencies2
Services Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

February 17, 2026 — 7 citations

Citations issued on February 17, 2026
TagWhat the surveyor checksStatus
E-0039Conduct testing and exercise requirements.Deficient, Provider has date of correction (March 16, 2026)
K-0344Have an alternate power supply for its alarm system.Deficient, Provider has date of correction (March 16, 2026)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (March 16, 2026)
K-0711Provide a written emergency evacuation plan.Deficient, Provider has date of correction (March 16, 2026)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (March 16, 2026)
K-0919Meet requirements for the use of electrical equipment.Deficient, Provider has date of correction (March 16, 2026)
K-0923Have proper medical gas storage and administration areas.Deficient, Provider has date of correction (March 16, 2026)

November 22, 2024 — 9 citations

Citations issued on November 22, 2024
TagWhat the surveyor checksStatus
E-0031Provide emergency officials' contact information.Deficient, Provider has date of correction (January 13, 2025)
K-0161Use approved construction type or materials.Deficient, Provider has date of correction (January 13, 2025)
K-0291Install emergency lighting that can last at least 1 1/2 hours.Deficient, Provider has date of correction (January 13, 2025)
K-0293Have properly located and lighted "Exit" signs.Deficient, Provider has date of correction (January 13, 2025)
K-0325Have properly installed hallway dispensers for alcohol-based hand rub.Deficient, Provider has date of correction (January 13, 2025)
K-0344Have an alternate power supply for its alarm system.Deficient, Provider has date of correction (January 13, 2025)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (January 13, 2025)
K-0711Provide a written emergency evacuation plan.Deficient, Provider has date of correction (January 13, 2025)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (January 13, 2025)

May 12, 2023 — 10 citations

Citations issued on May 12, 2023
TagWhat the surveyor checksStatus
K-0161Use approved construction type or materials.Deficient, Provider has date of correction (June 8, 2023)
K-0291Install emergency lighting that can last at least 1 1/2 hours.Deficient, Provider has date of correction (June 8, 2023)
K-0324Provide properly protected cooking facilities.Deficient, Provider has date of correction (June 8, 2023)
K-0347Properly provide smoke detection systems in areas open to corridors.Deficient, Provider has date of correction (June 8, 2023)
K-0355Properly select, install, inspect, or maintain portable fire extinguishes.Deficient, Provider has date of correction (June 8, 2023)
K-0521Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions.Deficient, Provider has date of correction (June 8, 2023)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (June 8, 2023)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (June 8, 2023)
K-0919Meet requirements for the use of electrical equipment.Deficient, Provider has date of correction (June 8, 2023)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (June 8, 2023)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.