Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

ARVADA CARE AND REHABILITATION CENTER

ARVADA, CO · 54 certified beds · Last Life Safety survey March 12, 2025

CMS Certification Number 065321 · first certified May 1994

Ownership

Operated by THE ENSIGN GROUP · For profit - Corporation

No change of ownership on CMS record since January 1, 2016, when the records begin.

17
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
4
Tags cited more than once
Across separate surveys
9
Inspection & testing records
Of the citations on file

Position within CO

17 citations — more than 51% of the 210 certified nursing homes in CO. Compared within CO rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Improvingfewer citations at the latest survey than at its earlier surveys in the window.

The latest survey found 4 citations; the earlier surveys in the window averaged 6.5. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window is open now: August 2026 to March 2027. This facility’s last Life Safety survey was March 2025. Facilities in CO are typically surveyed 17–24 months after the last one (median 19), measured over 177 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about ARVADA CARE AND REHABILITATION CENTER

One email when it happens. No account; stop it any time with one click.

Which alerts

2 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Physical environment (health survey)

2 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 17 Life Safety citations above. The Physical Environment Index

  • F-0880 Provide and implement an infection prevention and control program.

How that compares

Citations on file over three years

Compared with the median facility in CO, and nationally. Surveyors differ markedly between states, so the CO figure is the meaningful one.

This facility17CO median16National median11
Citations on file over three years, compared
MeasureCitations
This facility17
Median facility in CO16
Median facility nationally11

Survey history

Citations at each Life Safety survey
22022-05112023-0842025-03
Citations at each Life Safety survey
Survey dateCitations
May 18, 20222
August 17, 202311
March 12, 20254

Most-cited tags

Most-cited tags at this facility
K-05213K-02112K-03242K-02932K-03531K-03551K-03631K-09271
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0521Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions.32025-03-12
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.22025-03-12
K-0324Provide properly protected cooking facilities.22023-08-17
K-0293Have properly located and lighted "Exit" signs.22025-03-12
K-0353Inspect, test, and maintain automatic sprinkler systems.12023-08-17
K-0355Properly select, install, inspect, or maintain portable fire extinguishes.12023-08-17
K-0363Install corridor and hallway doors that block smoke.12025-03-12
K-0927Have proper fire barriers, ventilation and signs for the transfilling of oxygen.12023-08-17

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 6
  • Egress Deficiencies 4
  • Services Deficiencies 4
  • Gas, Vacuum, and Electrical Systems Deficiencies 3
Citations by CMS category
CategoryCitations
Smoke Deficiencies6
Egress Deficiencies4
Services Deficiencies4
Gas, Vacuum, and Electrical Systems Deficiencies3

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

March 12, 2025 — 4 citations

Citations issued on March 12, 2025
TagWhat the surveyor checksStatus
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (April 11, 2025)
K-0293Have properly located and lighted "Exit" signs.Deficient, Provider has date of correction (April 11, 2025)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (April 11, 2025)
K-0521Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions.Waiver has been granted (April 25, 2025)

August 17, 2023 — 11 citations

Citations issued on August 17, 2023
TagWhat the surveyor checksStatus
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (October 4, 2023)
K-0293Have properly located and lighted "Exit" signs.Deficient, Provider has date of correction (October 27, 2023)
K-0324Provide properly protected cooking facilities.Deficient, Provider has date of correction (October 31, 2023)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (October 31, 2023)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (October 27, 2023)
K-0355Properly select, install, inspect, or maintain portable fire extinguishes.Deficient, Provider has date of correction (October 27, 2023)
K-0521Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions.Deficient, Provider has date of correction (October 31, 2023)
K-0541Install properly constructed and protected linen or trash chutes.Deficient, Provider has date of correction (October 4, 2023)
K-0911Meet requirements for the installation and maintenance of electrical systems.Deficient, Provider has date of correction (October 31, 2023)
K-0914Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing.Deficient, Provider has date of correction (November 30, 2023)
K-0927Have proper fire barriers, ventilation and signs for the transfilling of oxygen.Deficient, Provider has date of correction (November 21, 2023)

May 18, 2022 — 2 citations

Citations issued on May 18, 2022
TagWhat the surveyor checksStatus
K-0324Provide properly protected cooking facilities.Deficient, Provider has date of correction (July 28, 2022)
K-0521Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions.Waiver has been granted (July 14, 2022)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.