Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
LAKEWOOD POST ACUTE AND REHABILITATION
LAKEWOOD, CO · 108 certified beds · Last Life Safety survey March 27, 2025
CMS Certification Number 065400 · first certified July 2010
Ownership
Operated by PACS GROUP · For profit - Limited Liability company
- Ownership changed September 1, 2023 (change of ownership)from 7395 W EASTMAN PLACE OPERATIONS II LLC
Position within CO
23 citations — more than 68% of the 210 certified nursing homes in CO. Compared within CO rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 2 citations; the earlier surveys in the window averaged 10.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window is open now: September 2026 to April 2027. This facility’s last Life Safety survey was March 2025. Facilities in CO are typically surveyed 17–24 months after the last one (median 19), measured over 177 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about LAKEWOOD POST ACUTE AND REHABILITATION
One email when it happens. No account; stop it any time with one click.
4 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
1 of the 23 citations on file is Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
3 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 23 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in CO, and nationally. Surveyors differ markedly between states, so the CO figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 23 |
| Median facility in CO | 16 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| February 25, 2020 | 11 |
| September 28, 2023 | 10 |
| March 27, 2025 | 2 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0712 | Have simulated fire drills held at unexpected times. | 3 | 2025-03-27 |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | 3 | 2025-03-27 |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 2 | 2023-09-28 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 2 | 2023-09-28 |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 1 | 2020-02-25 |
| K-0927 | Have proper fire barriers, ventilation and signs for the transfilling of oxygen. | 1 | 2023-09-28 |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | 1 | 2023-09-28 |
| K-0911 | Meet requirements for the installation and maintenance of electrical systems. | 1 | 2020-02-25 |
What the citations cover
- Smoke Deficiencies 6
- Services Deficiencies 5
- Gas, Vacuum, and Electrical Systems Deficiencies 4
- Miscellaneous Deficiencies 4
- Other 4
| Category | Citations |
|---|---|
| Smoke Deficiencies | 6 |
| Services Deficiencies | 5 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 4 |
| Miscellaneous Deficiencies | 4 |
| Egress Deficiencies | 3 |
| Emergency Preparedness Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
March 27, 2025 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Deficient, Provider has plan of correction (April 24, 2025) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (April 24, 2025) |
September 28, 2023 — 10 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0001 | Establish an Emergency Preparedness Program (EP). | Deficient, Provider has date of correction (October 22, 2023) |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (November 1, 2023) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (November 27, 2023) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (November 27, 2023) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (November 27, 2023) |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Deficient, Provider has date of correction (November 27, 2023) |
| K-0522 | Have an externally vented heating system. | Deficient, Provider has date of correction (October 26, 2023) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (October 31, 2023) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (November 27, 2023) |
| K-0927 | Have proper fire barriers, ventilation and signs for the transfilling of oxygen. | Deficient, Provider has date of correction (November 27, 2023) |
February 25, 2020 — 11 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (September 14, 2020) |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (September 16, 2020) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (September 14, 2020) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (October 16, 2020) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (September 23, 2020) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (October 13, 2020) |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Deficient, Provider has date of correction (October 18, 2020) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (October 14, 2020) |
| K-0751 | Have restrictions on the use of flammable curtains. | Deficient, Provider has date of correction (October 16, 2020) |
| K-0911 | Meet requirements for the installation and maintenance of electrical systems. | Deficient, Provider has date of correction (September 5, 2020) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (September 14, 2020) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.