Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
VERNON REHABILITATION AND HEALTHCARE CENTER
VERNON, CT · 120 certified beds · Last Life Safety survey July 27, 2026
CMS Certification Number 075334 · first certified January 1990
Ownership
Operated by ATLAS HEALTHCARE · For profit - Corporation
- Ownership changed July 27, 2022 (change of ownership)from VERNON MANOR HEALTH CARE CENTER, LLC
Position within CT
9 citations — more than 41% of the 191 certified nursing homes in CT. Compared within CT rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 5 citations; the earlier surveys on file averaged 2. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens March 2028 — about 16 months from now. This facility’s last Life Safety survey was July 2026. Facilities in CT are typically surveyed 20–26 months after the last one (median 22), measured over 228 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to about three years in Virginia. How the window is measured
Get an email about VERNON REHABILITATION AND HEALTHCARE CENTER
One email when it happens. No account; stop it any time with one click.
1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities cited for sprinkler inspection and testing in CMS’s current file are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Physical environment (health survey)
1 physical-environment citation on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 9 Life Safety citations above. The Physical Environment Index
- F-0880 Provide and implement an infection prevention and control program.
How that compares
Compared with the median facility in CT, and nationally. Surveyors differ markedly between states, so the CT figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 9 |
| Median facility in CT | 11 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| June 30, 2022 | 0 |
| October 11, 2024 | 4 |
| July 27, 2026 | 5 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 2 | 2026-07-27 |
| K-0712 | Have simulated fire drills held at unexpected times. | 1 | 2024-10-11 |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | 1 | 2024-10-11 |
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | 1 | 2026-07-27 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 1 | 2026-07-27 |
| K-0271 | Have exits that are accessible at all times. | 1 | 2026-07-27 |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 1 | 2024-10-11 |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | 1 | 2026-07-27 |
What the citations cover
- Smoke Deficiencies 3
- Egress Deficiencies 3
- Gas, Vacuum, and Electrical Systems Deficiencies 2
- Miscellaneous Deficiencies 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 3 |
| Egress Deficiencies | 3 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 2 |
| Miscellaneous Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
July 27, 2026 — 5 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (September 3, 2026) |
| K-0271 | Have exits that are accessible at all times. | Deficient, Provider has date of correction (September 3, 2026) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (September 3, 2026) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (September 3, 2026) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (September 3, 2026) |
October 11, 2024 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (October 18, 2024) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (October 18, 2024) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (October 18, 2024) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (October 18, 2024) |