Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

AUTUMN LAKE HEALTHCARE AT WINDSOR

WINDSOR, CT · 108 certified beds · Last Life Safety survey March 11, 2026

CMS Certification Number 075011 · first certified September 1971

Ownership

Independently operated (no chain recorded by CMS) · For profit - Corporation

No change of ownership on CMS record since January 1, 2016, when the records begin.

40
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
9
Tags cited more than once
Across separate surveys
14
Inspection & testing records
Of the citations on file

Position within CT

40 citations — more than 100% of the 191 certified nursing homes in CT. Compared within CT rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Slippingmore citations at the latest survey than at its earlier surveys in the window.

The latest survey found 15 citations; the earlier surveys in the window averaged 12.5. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window opens December 2027 — about 15 months from now. This facility’s last Life Safety survey was March 2026. Facilities in CT are typically surveyed 21–28 months after the last one (median 24), measured over 181 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about AUTUMN LAKE HEALTHCARE AT WINDSOR

One email when it happens. No account; stop it any time with one click.

Which alerts

3 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Emergency preparedness

4 of the 40 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

Physical environment (health survey)

2 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 40 Life Safety citations above. The Physical Environment Index

  • F-0880 Provide and implement an infection prevention and control program.

How that compares

Citations on file over three years

Compared with the median facility in CT, and nationally. Surveyors differ markedly between states, so the CT figure is the meaningful one.

This facility40CT median10National median11
Citations on file over three years, compared
MeasureCitations
This facility40
Median facility in CT10
Median facility nationally11

Survey history

Citations at each Life Safety survey
62021-12192024-03152026-03
Citations at each Life Safety survey
Survey dateCitations
December 7, 20216
March 12, 202419
March 11, 202615

Most-cited tags

Most-cited tags at this facility
K-05003K-03633K-07613K-02222K-02232K-03532K-07112K-09202
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0500Meet other general requirements that are deficient.32026-03-11
K-0363Install corridor and hallway doors that block smoke.32026-03-11
K-0761To conduct inspection, testing and maintenance of fire doors by qualified individuals.32026-03-11
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.22026-03-11
K-0223Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector.22024-03-12
K-0353Inspect, test, and maintain automatic sprinkler systems.22026-03-11
K-0711Provide a written emergency evacuation plan.22026-03-11
K-0920Ensure proper usage of power strips and extension cords.22024-03-12

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 10
  • Miscellaneous Deficiencies 8
  • Egress Deficiencies 8
  • Gas, Vacuum, and Electrical Systems Deficiencies 5
  • Other 9
Citations by CMS category
CategoryCitations
Smoke Deficiencies10
Miscellaneous Deficiencies8
Egress Deficiencies8
Gas, Vacuum, and Electrical Systems Deficiencies5
Services Deficiencies4
Emergency Preparedness Deficiencies4
Construction Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

March 11, 2026 — 15 citations

Citations issued on March 11, 2026
TagWhat the surveyor checksStatus
E-0004Develop and maintain an Emergency Preparedness Program (EP).Deficient, Provider has date of correction (May 22, 2026)
K-0100Meet other general requirements.Deficient, Provider has date of correction (May 22, 2026)
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.Deficient, Provider has date of correction (May 22, 2026)
K-0271Have exits that are accessible at all times.Deficient, Provider has date of correction (May 22, 2026)
K-0324Provide properly protected cooking facilities.Deficient, Provider has date of correction (May 22, 2026)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (May 22, 2026)
K-0362Ensure that corridors are separated from use areas by walls constructed to limit the passage of smoke.Deficient, Provider has date of correction (May 22, 2026)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (May 22, 2026)
K-0500Meet other general requirements that are deficient.Deficient, Provider has date of correction (May 22, 2026)
K-0541Install properly constructed and protected linen or trash chutes.Deficient, Provider has date of correction (May 22, 2026)
K-0711Provide a written emergency evacuation plan.Deficient, Provider has date of correction (May 22, 2026)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (May 22, 2026)
K-0761To conduct inspection, testing and maintenance of fire doors by qualified individuals.Deficient, Provider has date of correction (May 22, 2026)
K-0791Ensure that any exit in an area undergoing construction, repair, or improvements shall be inspected daily to ensure its ability to be used instantly in case of emergency.Deficient, Provider has date of correction (May 22, 2026)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (May 22, 2026)

March 12, 2024 — 19 citations

Citations issued on March 12, 2024
TagWhat the surveyor checksStatus
E-0004Develop and maintain an Emergency Preparedness Program (EP).Deficient, Provider has date of correction (February 27, 2024)
E-0036Establish emergency prep training and testing.Deficient, Provider has date of correction (February 27, 2024)
E-0037Establish staff and initial training requirements.Deficient, Provider has date of correction (February 27, 2024)
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (February 27, 2024)
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.Deficient, Provider has date of correction (February 27, 2024)
K-0223Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector.Deficient, Provider has date of correction (February 27, 2024)
K-0225Have stairways and smokeproof enclosures used as exits that meet safety requirements.Deficient, Provider has date of correction (March 7, 2024)
K-0291Install emergency lighting that can last at least 1 1/2 hours.Deficient, Provider has date of correction (February 27, 2024)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (February 27, 2024)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (March 14, 2024)
K-0355Properly select, install, inspect, or maintain portable fire extinguishes.Deficient, Provider has date of correction (February 27, 2024)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (February 28, 2024)
K-0500Meet other general requirements that are deficient.Deficient, Provider has date of correction (February 27, 2024)
K-0700Meet requirements for operating features, such as evacuation plans, fire drills, smoking regulations, draperies, decorations and the inspection, testing and maintenance of fire doors.Deficient, Provider has date of correction (February 27, 2024)
K-0711Provide a written emergency evacuation plan.Deficient, Provider has date of correction (February 27, 2024)
K-0761To conduct inspection, testing and maintenance of fire doors by qualified individuals.Deficient, Provider has date of correction (February 27, 2024)
K-0911Meet requirements for the installation and maintenance of electrical systems.Deficient, Provider has date of correction (February 27, 2024)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (February 27, 2024)
K-0930Ensure proper storage of liquid oxygen.Deficient, Provider has date of correction (February 27, 2024)

December 7, 2021 — 6 citations

Citations issued on December 7, 2021
TagWhat the surveyor checksStatus
K-0223Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector.Deficient, Provider has date of correction (January 28, 2022)
K-0347Properly provide smoke detection systems in areas open to corridors.Deficient, Provider has date of correction (January 28, 2022)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (January 28, 2022)
K-0500Meet other general requirements that are deficient.Deficient, Provider has date of correction (January 28, 2022)
K-0761To conduct inspection, testing and maintenance of fire doors by qualified individuals.Deficient, Provider has date of correction (January 28, 2022)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (January 28, 2022)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.