Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

BENTLEY CARE CENTER

NAPLES, FL · 84 certified beds · Last Life Safety survey November 21, 2024

CMS Certification Number 106062 · first certified December 2004

Ownership

Operated by VI LIVING · For profit - Corporation

No change of ownership on CMS record since January 1, 2016, when the records begin.

6
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
1
Tags cited more than once
Across separate surveys
4
Inspection & testing records
Of the citations on file

Position within FL

6 citations — more than 42% of the 694 certified nursing homes in FL. Compared within FL rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Slippingmore citations at the latest survey than at its earlier surveys in the window.

The latest survey found 0 citations; the earlier surveys in the window averaged 3. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window is open now: March 2026 to October 2026. This facility’s last Life Safety survey was November 2024. Facilities in FL are typically surveyed 15–23 months after the last one (median 17), measured over 729 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about BENTLEY CARE CENTER

One email when it happens. No account; stop it any time with one click.

Which alerts

1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Physical environment (health survey)

2 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 6 Life Safety citations above. The Physical Environment Index

  • F-0880 Provide and implement an infection prevention and control program.
  • F-0919 Make sure that a working call system is available in each resident's bathroom and bathing area.

How that compares

Citations on file over three years

Compared with the median facility in FL, and nationally. Surveyors differ markedly between states, so the FL figure is the meaningful one.

This facility6FL median7National median11
Citations on file over three years, compared
MeasureCitations
This facility6
Median facility in FL7
Median facility nationally11

Survey history

Citations at each Life Safety survey
12021-0752023-0302024-11
Citations at each Life Safety survey
Survey dateCitations
July 29, 20211
March 2, 20235
November 21, 20240

Most-cited tags

Most-cited tags at this facility
K-09182K-09201K-03451K-03551K-02711
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0918Have generator or other power source capable of supplying service within 10 seconds.22023-03-02
K-0920Ensure proper usage of power strips and extension cords.12023-03-02
K-0345Have approved installation, maintenance and testing program for fire alarm systems.12023-03-02
K-0355Properly select, install, inspect, or maintain portable fire extinguishes.12023-03-02
K-0271Have exits that are accessible at all times.12023-03-02

What the citations cover

Citations by CMS category
  • Gas, Vacuum, and Electrical Systems Deficiencies 3
  • Smoke Deficiencies 2
  • Egress Deficiencies 1
Citations by CMS category
CategoryCitations
Gas, Vacuum, and Electrical Systems Deficiencies3
Smoke Deficiencies2
Egress Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

March 2, 2023 — 5 citations

Citations issued on March 2, 2023
TagWhat the surveyor checksStatus
K-0271Have exits that are accessible at all times.Deficient, Provider has date of correction (April 1, 2023)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (April 1, 2023)
K-0355Properly select, install, inspect, or maintain portable fire extinguishes.Deficient, Provider has date of correction (April 1, 2023)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (April 1, 2023)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (April 1, 2023)

July 29, 2021 — 1 citation

Citations issued on July 29, 2021
TagWhat the surveyor checksStatus
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (August 29, 2021)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.