Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
PR SNF OPERATIONS LLC
SARASOTA, FL · 60 certified beds · Last Life Safety survey August 29, 2024
CMS Certification Number 106022 · first certified June 2000
Also on this campus
The same campus holds a state-licensed assisted living facility, with its own state record on the Assisted Living Index: Palmer Ranch Residence (5111 Palmer Ranch Parkway). Matched by the street address the two records share. The records are separate and are never added together.
Ownership
Independently operated (no chain recorded by CMS) · For profit - Limited Liability company
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within FL
12 citations — more than 78% of the 694 certified nursing homes in FL. Compared within FL rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
When is the next survey likely?
Past the typical window (December 2025 to July 2026). Most FL facilities have been surveyed by October 2026. This facility’s last Life Safety survey was August 2024. Facilities in FL are typically surveyed 15–23 months after the last one (median 17), measured over 729 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about PR SNF OPERATIONS LLC
One email when it happens. No account; stop it any time with one click.
Emergency preparedness
1 of the 12 citations on file is Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
2 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 12 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in FL, and nationally. Surveyors differ markedly between states, so the FL figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 12 |
| Median facility in FL | 7 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| September 10, 2021 | 0 |
| May 11, 2023 | 12 |
| August 29, 2024 | 0 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| E-0004 | Develop and maintain an Emergency Preparedness Program (EP). | 1 | 2023-05-11 |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | 1 | 2023-05-11 |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | 1 | 2023-05-11 |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 1 | 2023-05-11 |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | 1 | 2023-05-11 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 1 | 2023-05-11 |
| K-0741 | Have posted "No-smoking" signs in areas where smoking is not permitted or ashtrays provided where smoking was allowed. | 1 | 2023-05-11 |
| K-0223 | Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector. | 1 | 2023-05-11 |
What the citations cover
- Smoke Deficiencies 3
- Gas, Vacuum, and Electrical Systems Deficiencies 3
- Egress Deficiencies 2
- Miscellaneous Deficiencies 2
- Other 2
| Category | Citations |
|---|---|
| Smoke Deficiencies | 3 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 3 |
| Egress Deficiencies | 2 |
| Miscellaneous Deficiencies | 2 |
| Services Deficiencies | 1 |
| Emergency Preparedness Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
May 11, 2023 — 12 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0004 | Develop and maintain an Emergency Preparedness Program (EP). | Deficient, Provider has date of correction (June 11, 2023) |
| K-0223 | Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector. | Deficient, Provider has date of correction (June 11, 2023) |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (June 11, 2023) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (June 11, 2023) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (June 11, 2023) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (June 11, 2023) |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Deficient, Provider has date of correction (June 11, 2023) |
| K-0741 | Have posted "No-smoking" signs in areas where smoking is not permitted or ashtrays provided where smoking was allowed. | Deficient, Provider has date of correction (June 11, 2023) |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | Deficient, Provider has date of correction (June 11, 2023) |
| K-0914 | Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing. | Deficient, Provider has date of correction (June 11, 2023) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (June 11, 2023) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (June 11, 2023) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.