Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
Townsend Park Health and Rehabilitation
Cartersville, GA · 124 certified beds · Last Life Safety survey April 10, 2025
CMS Certification Number 115461 · first certified November 1989
Ownership
Operated by ETHICA HEALTH · Non profit - Other
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within GA
14 citations — more than 74% of the 356 certified nursing homes in GA. Compared within GA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 8 citations; the earlier surveys in the window averaged 3. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window is open now: June 2026 to December 2026. This facility’s last Life Safety survey was April 2025. Facilities in GA are typically surveyed 14–20 months after the last one (median 16), measured over 532 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about Townsend Park Health and Rehabilitation
One email when it happens. No account; stop it any time with one click.
2 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
1 of the 14 citations on file is Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
3 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 14 Life Safety citations above. The Physical Environment Index
- F-0880 Provide and implement an infection prevention and control program.
How that compares
Compared with the median facility in GA, and nationally. Surveyors differ markedly between states, so the GA figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 14 |
| Median facility in GA | 8 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| July 22, 2021 | 3 |
| April 27, 2023 | 3 |
| April 10, 2025 | 8 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | 3 | 2025-04-10 |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 2 | 2025-04-10 |
| K-0511 | Have properly installed electrical wiring and gas equipment. | 2 | 2025-04-10 |
| K-0311 | Have an enclosure around a vertical opening shaft. | 2 | 2025-04-10 |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 2 | 2025-04-10 |
| K-0923 | Have proper medical gas storage and administration areas. | 1 | 2025-04-10 |
| K-0293 | Have properly located and lighted "Exit" signs. | 1 | 2025-04-10 |
| E-0037 | Establish staff and initial training requirements. | 1 | 2025-04-10 |
What the citations cover
- Smoke Deficiencies 6
- Egress Deficiencies 4
- Services Deficiencies 2
- Emergency Preparedness Deficiencies 1
- Other 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 6 |
| Egress Deficiencies | 4 |
| Services Deficiencies | 2 |
| Emergency Preparedness Deficiencies | 1 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
April 10, 2025 — 8 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0037 | Establish staff and initial training requirements. | Deficient, Provider has date of correction (May 23, 2025) |
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (May 23, 2025) |
| K-0293 | Have properly located and lighted "Exit" signs. | Deficient, Provider has date of correction (May 23, 2025) |
| K-0311 | Have an enclosure around a vertical opening shaft. | Deficient, Provider has date of correction (May 23, 2025) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (May 23, 2025) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (May 23, 2025) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (May 23, 2025) |
| K-0923 | Have proper medical gas storage and administration areas. | Deficient, Provider has date of correction (May 23, 2025) |
April 27, 2023 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (June 11, 2023) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (June 11, 2023) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (June 11, 2023) |
July 22, 2021 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (September 5, 2021) |
| K-0311 | Have an enclosure around a vertical opening shaft. | Deficient, Provider has date of correction (September 5, 2021) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (September 5, 2021) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.