Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

WESTBURY CENTER OF CONYERS FOR NURSING AND HEALING

CONYERS, GA · 173 certified beds · Last Life Safety survey August 28, 2025

CMS Certification Number 115469 · first certified November 1989

Ownership

Operated by EMPIRE CARE CENTERS · For profit - Limited Liability company

  • Ownership changed May 1, 2021 (change of ownership)from WESTBURY CONYERS LLC
5
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
0
Tags cited more than once
Across separate surveys
2
Inspection & testing records
Of the citations on file

Position within GA

5 citations — more than 23% of the 356 certified nursing homes in GA. Compared within GA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Improvingfewer citations at the latest survey than at its earlier surveys in the window.

The latest survey found 2 citations; the earlier surveys in the window averaged 1.5. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window opens October 2026 — about 1 month from now. This facility’s last Life Safety survey was August 2025. Facilities in GA are typically surveyed 14–20 months after the last one (median 16), measured over 532 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about WESTBURY CENTER OF CONYERS FOR NURSING AND HEALING

One email when it happens. No account; stop it any time with one click.

Which alerts

Physical environment (health survey)

2 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 5 Life Safety citations above. The Physical Environment Index

  • F-0880 Provide and implement an infection prevention and control program.

How that compares

Citations on file over three years

Compared with the median facility in GA, and nationally. Surveyors differ markedly between states, so the GA figure is the meaningful one.

This facility5GA median8National median11
Citations on file over three years, compared
MeasureCitations
This facility5
Median facility in GA8
Median facility nationally11

Survey history

Citations at each Life Safety survey
02022-1032024-0522025-08
Citations at each Life Safety survey
Survey dateCitations
October 6, 20220
May 10, 20243
August 28, 20252

Most-cited tags

Most-cited tags at this facility
K-05111K-03511K-03531K-01311K-02111
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0511Have properly installed electrical wiring and gas equipment.12024-05-10
K-0351Install an approved automatic sprinkler system.12025-08-28
K-0353Inspect, test, and maintain automatic sprinkler systems.12024-05-10
K-0131Meet requirements for sections of health care facilities separated by fire resistive construction.12025-08-28
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.12024-05-10

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 2
  • Construction Deficiencies 1
  • Egress Deficiencies 1
  • Services Deficiencies 1
Citations by CMS category
CategoryCitations
Smoke Deficiencies2
Construction Deficiencies1
Egress Deficiencies1
Services Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

August 28, 2025 — 2 citations

Citations issued on August 28, 2025
TagWhat the surveyor checksStatus
K-0131Meet requirements for sections of health care facilities separated by fire resistive construction.Deficient, Provider has date of correction (September 30, 2025)
K-0351Install an approved automatic sprinkler system.Deficient, Provider has date of correction (September 30, 2025)

May 10, 2024 — 3 citations

Citations issued on May 10, 2024
TagWhat the surveyor checksStatus
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (June 20, 2024)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (June 20, 2024)
K-0511Have properly installed electrical wiring and gas equipment.Deficient, Provider has date of correction (June 20, 2024)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.