Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

Dublin Trails of Journey LLC

Dublin, GA · 105 certified beds · Last Life Safety survey June 17, 2026

CMS Certification Number 115495 · first certified November 1989

Ownership

Operated by JOURNEY HEALTHCARE · For profit - Limited Liability company

  • Ownership changed October 1, 2024 (change of ownership)from PREMIER ESTATES OF DUBLIN LLC
29
Citations on file
CMS's current file
3
Life Safety surveys
CMS's current file
5
Tags cited more than once
Across separate surveys
16
Inspection & testing records
Of the citations on file

Position within GA

29 citations — more than 99% of the 356 certified nursing homes in GA. Compared within GA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Improvingfewer citations at the latest survey than at its earlier surveys in CMS's current file.

The latest survey found 6 citations; the earlier surveys on file averaged 11.5. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window opens August 2027 — about 9 months from now. This facility’s last Life Safety survey was June 2026. Facilities in GA are typically surveyed 14–19 months after the last one (median 16), measured over 546 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to about three years in Virginia. How the window is measured

Get an email about Dublin Trails of Journey LLC

One email when it happens. No account; stop it any time with one click.

Which alerts

3 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities cited for sprinkler inspection and testing in CMS’s current file are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Emergency preparedness

1 of the 29 citations on file is Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

Physical environment (health survey)

3 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 29 Life Safety citations above. The Physical Environment Index

  • F-0880 Provide and implement an infection prevention and control program.
  • F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.

How that compares

Citations in CMS's current file

Compared with the median facility in GA, and nationally. Surveyors differ markedly between states, so the GA figure is the meaningful one.

This facility29GA median8National median11
Citations in CMS's current file, compared
MeasureCitations
This facility29
Median facility in GA8
Median facility nationally11

Survey history

Citations at each Life Safety survey
82023-11152025-0362026-06
Citations at each Life Safety survey
Survey dateCitations
November 30, 20238
March 31, 202515
June 17, 20266

Most-cited tags

Most-cited tags at this facility
K-03533K-05113K-02913K-02112K-02932K-09111K-03411K-02711
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0353Inspect, test, and maintain automatic sprinkler systems.32026-06-17
K-0511Have properly installed electrical wiring and gas equipment.32026-06-17
K-0291Install emergency lighting that can last at least 1 1/2 hours.32026-06-17
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.22025-03-31
K-0293Have properly located and lighted "Exit" signs.22026-06-17
K-0911Meet requirements for the installation and maintenance of electrical systems.12023-11-30
K-0341Install a fire alarm system that can be heard throughout the facility.12025-03-31
K-0271Have exits that are accessible at all times.12025-03-31

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 11
  • Egress Deficiencies 9
  • Miscellaneous Deficiencies 3
  • Services Deficiencies 3
  • Other 3
Citations by CMS category
CategoryCitations
Smoke Deficiencies11
Egress Deficiencies9
Miscellaneous Deficiencies3
Services Deficiencies3
Gas, Vacuum, and Electrical Systems Deficiencies2
Emergency Preparedness Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

June 17, 2026 — 6 citations

Citations issued on June 17, 2026
TagWhat the surveyor checksStatus
K-0223Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector.Deficient, Provider has date of correction (August 24, 2026)
K-0291Install emergency lighting that can last at least 1 1/2 hours.Deficient, Provider has date of correction (August 1, 2026)
K-0293Have properly located and lighted "Exit" signs.Deficient, Provider has date of correction (August 1, 2026)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (August 24, 2026)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (August 24, 2026)
K-0511Have properly installed electrical wiring and gas equipment.Deficient, Provider has date of correction (August 1, 2026)

March 31, 2025 — 15 citations

Citations issued on March 31, 2025
TagWhat the surveyor checksStatus
E-0001Establish an Emergency Preparedness Program (EP).Deficient, Provider has date of correction (April 30, 2025)
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (April 30, 2025)
K-0271Have exits that are accessible at all times.Deficient, Provider has date of correction (April 30, 2025)
K-0291Install emergency lighting that can last at least 1 1/2 hours.Deficient, Provider has date of correction (April 30, 2025)
K-0293Have properly located and lighted "Exit" signs.Deficient, Provider has date of correction (April 30, 2025)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (April 30, 2025)
K-0341Install a fire alarm system that can be heard throughout the facility.Deficient, Provider has date of correction (April 30, 2025)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (April 30, 2025)
K-0351Install an approved automatic sprinkler system.Deficient, Provider has date of correction (April 30, 2025)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (April 30, 2025)
K-0355Properly select, install, inspect, or maintain portable fire extinguishes.Deficient, Provider has date of correction (April 30, 2025)
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.Deficient, Provider has date of correction (April 30, 2025)
K-0511Have properly installed electrical wiring and gas equipment.Deficient, Provider has date of correction (April 30, 2025)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (April 30, 2025)
K-0761To conduct inspection, testing and maintenance of fire doors by qualified individuals.Deficient, Provider has date of correction (April 30, 2025)

November 30, 2023 — 8 citations

Citations issued on November 30, 2023
TagWhat the surveyor checksStatus
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (January 14, 2024)
K-0291Install emergency lighting that can last at least 1 1/2 hours.Deficient, Provider has date of correction (January 14, 2024)
K-0324Provide properly protected cooking facilities.Deficient, Provider has date of correction (January 14, 2024)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (January 14, 2024)
K-0511Have properly installed electrical wiring and gas equipment.Deficient, Provider has date of correction (January 14, 2024)
K-0781Have restrictions on the use of portable space heaters.Deficient, Provider has date of correction (January 14, 2024)
K-0911Meet requirements for the installation and maintenance of electrical systems.Deficient, Provider has date of correction (January 14, 2024)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (January 14, 2024)

Reflects the CMS posting of October 1, 2026. Surveys conducted in the last few months may not appear yet.