Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
Crossroads of Flowery Branch of Journey LLC, The
Flowery Branch, GA · 100 certified beds · Last Life Safety survey January 16, 2026
CMS Certification Number 115327 · first certified October 1984
Ownership
Operated by JOURNEY HEALTHCARE · For profit - Limited Liability company
- New ownershipOwnership changed November 1, 2024 (change of ownership)to THE CROSSROADS OF FLOWERY BRANCH OF JOURNEY LLC from WILLOWWOOD PAC LLC
Position within GA
17 citations — more than 83% of the 356 certified nursing homes in GA. Compared within GA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 7 citations; the earlier surveys in the window averaged 5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens March 2027 — about 6 months from now. This facility’s last Life Safety survey was January 2026. Facilities in GA are typically surveyed 14–20 months after the last one (median 16), measured over 532 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about Crossroads of Flowery Branch of Journey LLC, The
One email when it happens. No account; stop it any time with one click.
3 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
3 of the 17 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
4 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 17 Life Safety citations above. The Physical Environment Index
- F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
- F-0880 Provide and implement an infection prevention and control program.
- F-0908 Keep all essential equipment working safely.
How that compares
Compared with the median facility in GA, and nationally. Surveyors differ markedly between states, so the GA figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 17 |
| Median facility in GA | 8 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| November 6, 2022 | 6 |
| August 28, 2024 | 4 |
| January 16, 2026 | 7 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0324 | Provide properly protected cooking facilities. | 2 | 2024-08-28 |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | 2 | 2026-01-16 |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 2 | 2026-01-16 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 2 | 2026-01-16 |
| E-0037 | Establish staff and initial training requirements. | 1 | 2022-11-06 |
| K-0923 | Have proper medical gas storage and administration areas. | 1 | 2024-08-28 |
| K-0741 | Have posted "No-smoking" signs in areas where smoking is not permitted or ashtrays provided where smoking was allowed. | 1 | 2024-08-28 |
| E-0004 | Develop and maintain an Emergency Preparedness Program (EP). | 1 | 2022-11-06 |
What the citations cover
- Smoke Deficiencies 8
- Emergency Preparedness Deficiencies 3
- Egress Deficiencies 3
- Gas, Vacuum, and Electrical Systems Deficiencies 2
- Other 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 8 |
| Emergency Preparedness Deficiencies | 3 |
| Egress Deficiencies | 3 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 2 |
| Miscellaneous Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
January 16, 2026 — 7 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (February 12, 2026) |
| K-0293 | Have properly located and lighted "Exit" signs. | Deficient, Provider has date of correction (February 12, 2026) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (February 12, 2026) |
| K-0341 | Install a fire alarm system that can be heard throughout the facility. | Deficient, Provider has date of correction (February 12, 2026) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (February 12, 2026) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (February 12, 2026) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (February 12, 2026) |
August 28, 2024 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (October 10, 2024) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (October 10, 2024) |
| K-0741 | Have posted "No-smoking" signs in areas where smoking is not permitted or ashtrays provided where smoking was allowed. | Deficient, Provider has date of correction (October 10, 2024) |
| K-0923 | Have proper medical gas storage and administration areas. | Deficient, Provider has date of correction (October 10, 2024) |
November 6, 2022 — 6 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0004 | Develop and maintain an Emergency Preparedness Program (EP). | Deficient, Provider has date of correction (December 21, 2022) |
| E-0030 | List the names and contact information of those in the facility. | Deficient, Provider has date of correction (December 21, 2022) |
| E-0037 | Establish staff and initial training requirements. | Deficient, Provider has date of correction (December 21, 2022) |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (December 21, 2022) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (December 21, 2022) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (December 21, 2022) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.