Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

PRUITTHEALTH - FORSYTH

FORSYTH, GA · 72 certified beds · Last Life Safety survey May 17, 2026

CMS Certification Number 115418 · first certified June 1989

Ownership

Operated by PRUITTHEALTH · For profit - Corporation

No change of ownership on CMS record since January 1, 2016, when the records begin.

5
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
0
Tags cited more than once
Across separate surveys
2
Inspection & testing records
Of the citations on file

Position within GA

5 citations — more than 23% of the 356 certified nursing homes in GA. Compared within GA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Slippingmore citations at the latest survey than at its earlier surveys in the window.

The latest survey found 4 citations; the earlier surveys in the window averaged 0.5. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window opens July 2027 — about 10 months from now. This facility’s last Life Safety survey was May 2026. Facilities in GA are typically surveyed 14–20 months after the last one (median 16), measured over 532 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about PRUITTHEALTH - FORSYTH

One email when it happens. No account; stop it any time with one click.

Which alerts

Emergency preparedness

1 of the 5 citations on file is Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

How that compares

Citations on file over three years

Compared with the median facility in GA, and nationally. Surveyors differ markedly between states, so the GA figure is the meaningful one.

This facility5GA median8National median11
Citations on file over three years, compared
MeasureCitations
This facility5
Median facility in GA8
Median facility nationally11

Survey history

Citations at each Life Safety survey
12023-1202025-0542026-05
Citations at each Life Safety survey
Survey dateCitations
December 17, 20231
May 15, 20250
May 17, 20264

Most-cited tags

Most-cited tags at this facility
K-02931K-09231K-03211K-03451E-00041
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0293Have properly located and lighted "Exit" signs.12026-05-17
K-0923Have proper medical gas storage and administration areas.12026-05-17
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.12026-05-17
K-0345Have approved installation, maintenance and testing program for fire alarm systems.12026-05-17
E-0004Develop and maintain an Emergency Preparedness Program (EP).12023-12-17

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 2
  • Gas, Vacuum, and Electrical Systems Deficiencies 1
  • Egress Deficiencies 1
  • Emergency Preparedness Deficiencies 1
Citations by CMS category
CategoryCitations
Smoke Deficiencies2
Gas, Vacuum, and Electrical Systems Deficiencies1
Egress Deficiencies1
Emergency Preparedness Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

May 17, 2026 — 4 citations

Citations issued on May 17, 2026
TagWhat the surveyor checksStatus
K-0293Have properly located and lighted "Exit" signs.Deficient, Provider has date of correction (June 22, 2026)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (June 22, 2026)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (June 22, 2026)
K-0923Have proper medical gas storage and administration areas.Deficient, Provider has date of correction (June 22, 2026)

December 17, 2023 — 1 citation

Citations issued on December 17, 2023
TagWhat the surveyor checksStatus
E-0004Develop and maintain an Emergency Preparedness Program (EP).Deficient, Provider has date of correction (January 31, 2024)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.