Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
Glenwood Health and Rehabilitation
GLENWOOD, GA · 62 certified beds · Last Life Safety survey March 8, 2026
CMS Certification Number 115703 · first certified October 2005
Ownership
Operated by BRIGHTON HEALTHCARE · For profit - Limited Liability company
- New ownershipOwnership changed May 1, 2025 (change of ownership)from GW SNF LLC
Position within GA
22 citations — more than 93% of the 356 certified nursing homes in GA. Compared within GA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 14 citations; the earlier surveys in the window averaged 4. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens May 2027 — about 7 months from now. This facility’s last Life Safety survey was March 2026. Facilities in GA are typically surveyed 14–20 months after the last one (median 16), measured over 532 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about Glenwood Health and Rehabilitation
One email when it happens. No account; stop it any time with one click.
4 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
3 of the 22 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
2 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 22 Life Safety citations above. The Physical Environment Index
- F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
How that compares
Compared with the median facility in GA, and nationally. Surveyors differ markedly between states, so the GA figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 22 |
| Median facility in GA | 8 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| July 23, 2023 | 5 |
| November 10, 2024 | 3 |
| March 8, 2026 | 14 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 3 | 2026-03-08 |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 2 | 2026-03-08 |
| K-0324 | Provide properly protected cooking facilities. | 2 | 2026-03-08 |
| K-0511 | Have properly installed electrical wiring and gas equipment. | 2 | 2026-03-08 |
| E-0039 | Conduct testing and exercise requirements. | 1 | 2023-07-23 |
| K-0712 | Have simulated fire drills held at unexpected times. | 1 | 2026-03-08 |
| K-0741 | Have posted "No-smoking" signs in areas where smoking is not permitted or ashtrays provided where smoking was allowed. | 1 | 2026-03-08 |
| K-0293 | Have properly located and lighted "Exit" signs. | 1 | 2026-03-08 |
What the citations cover
- Smoke Deficiencies 9
- Egress Deficiencies 4
- Emergency Preparedness Deficiencies 3
- Services Deficiencies 2
- Other 4
| Category | Citations |
|---|---|
| Smoke Deficiencies | 9 |
| Egress Deficiencies | 4 |
| Emergency Preparedness Deficiencies | 3 |
| Services Deficiencies | 2 |
| Miscellaneous Deficiencies | 2 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 2 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
March 8, 2026 — 14 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0032 | Provide primary/alternate means for communication. | Deficient, Provider has date of correction (April 15, 2026) |
| E-0036 | Establish emergency prep training and testing. | Deficient, Provider has date of correction (April 15, 2026) |
| K-0232 | Have corridors or aisles that are unobstructed and are at least 8 feet in width. | Deficient, Provider has date of correction (April 15, 2026) |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (April 15, 2026) |
| K-0293 | Have properly located and lighted "Exit" signs. | Deficient, Provider has date of correction (April 15, 2026) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (April 15, 2026) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (May 14, 2026) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (April 15, 2026) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (April 15, 2026) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (April 15, 2026) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (April 15, 2026) |
| K-0741 | Have posted "No-smoking" signs in areas where smoking is not permitted or ashtrays provided where smoking was allowed. | Deficient, Provider has date of correction (April 15, 2026) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (April 15, 2026) |
| K-0923 | Have proper medical gas storage and administration areas. | Deficient, Provider has date of correction (April 15, 2026) |
November 10, 2024 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (December 25, 2024) |
| K-0371 | Have properly sized and located compartments to protect residents from smoke. | Deficient, Provider has date of correction (December 25, 2024) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (December 25, 2024) |
July 23, 2023 — 5 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0039 | Conduct testing and exercise requirements. | Deficient, Provider has date of correction (August 31, 2023) |
| K-0221 | Provide rooms that can be unlocked from inside without a key. | Deficient, Provider has date of correction (August 31, 2023) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (August 31, 2023) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (August 31, 2023) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (August 31, 2023) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.