Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
Hazelhurst Court Care and Rehabilitation Center
HAZLEHURST, GA · 73 certified beds · Last Life Safety survey March 29, 2026
CMS Certification Number 115626 · first certified January 1997
Ownership
Operated by BEACON HEALTH MANAGEMENT · For profit - Corporation
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within GA
14 citations — more than 74% of the 356 certified nursing homes in GA. Compared within GA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 5 citations; the earlier surveys in the window averaged 4.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens June 2027 — about 8 months from now. This facility’s last Life Safety survey was March 2026. Facilities in GA are typically surveyed 14–20 months after the last one (median 16), measured over 532 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about Hazelhurst Court Care and Rehabilitation Center
One email when it happens. No account; stop it any time with one click.
3 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
1 of the 14 citations on file is Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
4 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 14 Life Safety citations above. The Physical Environment Index
- F-0921 Make sure that the nursing home area is safe, easy to use, clean and comfortable for residents, staff and the public.
- F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
- F-0880 Provide and implement an infection prevention and control program.
How that compares
Compared with the median facility in GA, and nationally. Surveyors differ markedly between states, so the GA figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 14 |
| Median facility in GA | 8 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| September 10, 2023 | 6 |
| February 2, 2025 | 3 |
| March 29, 2026 | 5 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 3 | 2026-03-29 |
| K-0511 | Have properly installed electrical wiring and gas equipment. | 2 | 2026-03-29 |
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | 2 | 2025-02-02 |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | 2 | 2026-03-29 |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | 1 | 2026-03-29 |
| K-0223 | Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector. | 1 | 2026-03-29 |
| K-0200 | Meet other general requirements. | 1 | 2023-09-10 |
| E-0018 | Establish procedures for tracking staff and patients during an emergency. | 1 | 2023-09-10 |
What the citations cover
- Smoke Deficiencies 7
- Egress Deficiencies 4
- Services Deficiencies 2
- Emergency Preparedness Deficiencies 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 7 |
| Egress Deficiencies | 4 |
| Services Deficiencies | 2 |
| Emergency Preparedness Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
March 29, 2026 — 5 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0223 | Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector. | Deficient, Provider has date of correction (May 14, 2026) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (May 14, 2026) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (May 14, 2026) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (May 14, 2026) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (May 14, 2026) |
February 2, 2025 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (February 28, 2025) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (February 28, 2025) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (February 28, 2025) |
September 10, 2023 — 6 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0018 | Establish procedures for tracking staff and patients during an emergency. | Deficient, Provider has date of correction (October 25, 2023) |
| K-0200 | Meet other general requirements. | Deficient, Provider has date of correction (October 25, 2023) |
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (October 25, 2023) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (October 25, 2023) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (October 25, 2023) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (October 25, 2023) |