Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

MIONA GERIATRIC & DEMENTIA CENTER

IDEAL, GA · 88 certified beds · Last Life Safety survey April 27, 2026

CMS Certification Number 115338 · first certified December 1985

Ownership

Independently operated (no chain recorded by CMS) · For profit - Limited Liability company

No change of ownership on CMS record since January 1, 2016, when the records begin.

10
Citations on file
CMS's current file
3
Life Safety surveys
CMS's current file
1
Tags cited more than once
Across separate surveys
4
Inspection & testing records
Of the citations on file

Position within GA

10 citations — more than 58% of the 356 certified nursing homes in GA. Compared within GA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Slippingmore citations at the latest survey than at its earlier surveys in CMS's current file.

The latest survey found 8 citations; the earlier surveys on file averaged 1. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window opens June 2027 — about 7 months from now. This facility’s last Life Safety survey was April 2026. Facilities in GA are typically surveyed 14–19 months after the last one (median 16), measured over 546 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to about three years in Virginia. How the window is measured

Get an email about MIONA GERIATRIC & DEMENTIA CENTER

One email when it happens. No account; stop it any time with one click.

Which alerts

Emergency preparedness

1 of the 10 citations on file is Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

How that compares

Citations in CMS's current file

Compared with the median facility in GA, and nationally. Surveyors differ markedly between states, so the GA figure is the meaningful one.

This facility10GA median8National median11
Citations in CMS's current file, compared
MeasureCitations
This facility10
Median facility in GA8
Median facility nationally11

Survey history

Citations at each Life Safety survey
22024-0302025-0382026-04
Citations at each Life Safety survey
Survey dateCitations
March 10, 20242
March 9, 20250
April 27, 20268

Most-cited tags

Most-cited tags at this facility
K-03212E-00011K-05111K-03531K-03721K-03551K-03411K-02931
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.22026-04-27
E-0001Establish an Emergency Preparedness Program (EP).12026-04-27
K-0511Have properly installed electrical wiring and gas equipment.12026-04-27
K-0353Inspect, test, and maintain automatic sprinkler systems.12026-04-27
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.12026-04-27
K-0355Properly select, install, inspect, or maintain portable fire extinguishes.12026-04-27
K-0341Install a fire alarm system that can be heard throughout the facility.12026-04-27
K-0293Have properly located and lighted "Exit" signs.12026-04-27

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 6
  • Miscellaneous Deficiencies 1
  • Egress Deficiencies 1
  • Services Deficiencies 1
  • Other 1
Citations by CMS category
CategoryCitations
Smoke Deficiencies6
Miscellaneous Deficiencies1
Egress Deficiencies1
Services Deficiencies1
Emergency Preparedness Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

April 27, 2026 — 8 citations

Citations issued on April 27, 2026
TagWhat the surveyor checksStatus
E-0001Establish an Emergency Preparedness Program (EP).Deficient, Provider has date of correction (May 27, 2026)
K-0293Have properly located and lighted "Exit" signs.Deficient, Provider has date of correction (May 27, 2026)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (May 27, 2026)
K-0341Install a fire alarm system that can be heard throughout the facility.Deficient, Provider has date of correction (May 27, 2026)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (May 27, 2026)
K-0355Properly select, install, inspect, or maintain portable fire extinguishes.Deficient, Provider has date of correction (May 27, 2026)
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.Deficient, Provider has date of correction (May 27, 2026)
K-0511Have properly installed electrical wiring and gas equipment.Deficient, Provider has date of correction (May 27, 2026)

March 10, 2024 — 2 citations

Citations issued on March 10, 2024
TagWhat the surveyor checksStatus
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (April 10, 2024)
K-0753Have restrictions on the use of highly flammable decorations.Deficient, Provider has date of correction (April 10, 2024)

Reflects the CMS posting of October 1, 2026. Surveys conducted in the last few months may not appear yet.