Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
HARBORVIEW HEALTH SYSTEMS JESUP
JESUP, GA · 90 certified beds · Last Life Safety survey May 7, 2026
CMS Certification Number 115414 · first certified August 1989
Ownership
Independently operated (no chain recorded by CMS) · For profit - Limited Liability company
- Ownership changed July 1, 2016 (change of ownership)from BEVERLY HEALTH AND REHABILITIATION SERVICES, INC
Position within GA
15 citations — more than 78% of the 356 certified nursing homes in GA. Compared within GA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 5 citations; the earlier surveys in the window averaged 5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens July 2027 — about 9 months from now. This facility’s last Life Safety survey was May 2026. Facilities in GA are typically surveyed 14–20 months after the last one (median 16), measured over 532 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about HARBORVIEW HEALTH SYSTEMS JESUP
One email when it happens. No account; stop it any time with one click.
2 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Physical environment (health survey)
1 physical-environment citation on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 15 Life Safety citations above. The Physical Environment Index
- F-0908 Keep all essential equipment working safely.
How that compares
Compared with the median facility in GA, and nationally. Surveyors differ markedly between states, so the GA figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 15 |
| Median facility in GA | 8 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| April 27, 2023 | 8 |
| April 10, 2025 | 2 |
| May 7, 2026 | 5 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0341 | Install a fire alarm system that can be heard throughout the facility. | 2 | 2026-05-07 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 2 | 2025-04-10 |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | 2 | 2026-05-07 |
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | 1 | 2026-05-07 |
| K-0511 | Have properly installed electrical wiring and gas equipment. | 1 | 2023-04-27 |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | 1 | 2023-04-27 |
| K-0293 | Have properly located and lighted "Exit" signs. | 1 | 2026-05-07 |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | 1 | 2023-04-27 |
What the citations cover
- Smoke Deficiencies 9
- Egress Deficiencies 3
- Gas, Vacuum, and Electrical Systems Deficiencies 1
- Miscellaneous Deficiencies 1
- Other 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 9 |
| Egress Deficiencies | 3 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 1 |
| Miscellaneous Deficiencies | 1 |
| Services Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
May 7, 2026 — 5 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (June 9, 2026) |
| K-0293 | Have properly located and lighted "Exit" signs. | Deficient, Provider has date of correction (June 9, 2026) |
| K-0341 | Install a fire alarm system that can be heard throughout the facility. | Deficient, Provider has date of correction (June 9, 2026) |
| K-0343 | Have a fire alarm with audible and visual signals that transmits the alarm automatically to notify emergency forces in event of fire. | Deficient, Provider has date of correction (June 9, 2026) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (June 9, 2026) |
April 10, 2025 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0341 | Install a fire alarm system that can be heard throughout the facility. | Deficient, Provider has date of correction (May 5, 2025) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (May 5, 2025) |
April 27, 2023 — 8 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (May 19, 2023) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (May 19, 2023) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (May 19, 2023) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (May 19, 2023) |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | Deficient, Provider has date of correction (May 19, 2023) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (May 19, 2023) |
| K-0781 | Have restrictions on the use of portable space heaters. | Deficient, Provider has date of correction (May 19, 2023) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (May 19, 2023) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.