Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
PRUITTHEALTH - MOULTRIE
MOULTRIE, GA · 68 certified beds · Last Life Safety survey May 22, 2025
CMS Certification Number 115505 · first certified February 1990
Ownership
Operated by PRUITTHEALTH · For profit - Limited Liability company
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within GA
7 citations — more than 40% of the 356 certified nursing homes in GA. Compared within GA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 4 citations; the earlier surveys in the window averaged 1.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window is open now: July 2026 to January 2027. This facility’s last Life Safety survey was May 2025. Facilities in GA are typically surveyed 14–20 months after the last one (median 16), measured over 532 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about PRUITTHEALTH - MOULTRIE
One email when it happens. No account; stop it any time with one click.
How that compares
Compared with the median facility in GA, and nationally. Surveyors differ markedly between states, so the GA figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 7 |
| Median facility in GA | 8 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| February 10, 2022 | 0 |
| September 7, 2023 | 3 |
| May 22, 2025 | 4 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 1 | 2023-09-07 |
| K-0781 | Have restrictions on the use of portable space heaters. | 1 | 2023-09-07 |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | 1 | 2025-05-22 |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | 1 | 2025-05-22 |
| K-0223 | Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector. | 1 | 2025-05-22 |
| K-0341 | Install a fire alarm system that can be heard throughout the facility. | 1 | 2025-05-22 |
| K-0511 | Have properly installed electrical wiring and gas equipment. | 1 | 2023-09-07 |
What the citations cover
- Smoke Deficiencies 4
- Services Deficiencies 1
- Egress Deficiencies 1
- Miscellaneous Deficiencies 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 4 |
| Services Deficiencies | 1 |
| Egress Deficiencies | 1 |
| Miscellaneous Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
May 22, 2025 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0223 | Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector. | Deficient, Provider has date of correction (June 27, 2025) |
| K-0341 | Install a fire alarm system that can be heard throughout the facility. | Deficient, Provider has date of correction (June 27, 2025) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (June 27, 2025) |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | Deficient, Provider has date of correction (June 27, 2025) |
September 7, 2023 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (October 19, 2023) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (October 19, 2023) |
| K-0781 | Have restrictions on the use of portable space heaters. | Deficient, Provider has date of correction (October 19, 2023) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.