Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

ORCHARD HEALTH AND REHABILITATION

PULASKI, GA · 89 certified beds · Last Life Safety survey July 16, 2026

CMS Certification Number 115522 · first certified May 1992

Ownership

Operated by ETHICA HEALTH · Non profit - Other

No change of ownership on CMS record since January 1, 2016, when the records begin.

26
Citations on file
CMS's current file
3
Life Safety surveys
CMS's current file
7
Tags cited more than once
Across separate surveys
11
Inspection & testing records
Of the citations on file

Position within GA

26 citations — more than 98% of the 356 certified nursing homes in GA. Compared within GA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Improvingfewer citations at the latest survey than at its earlier surveys in CMS's current file.

The latest survey found 6 citations; the earlier surveys on file averaged 10. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window opens September 2027 — about 10 months from now. This facility’s last Life Safety survey was July 2026. Facilities in GA are typically surveyed 14–19 months after the last one (median 16), measured over 546 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to about three years in Virginia. How the window is measured

Get an email about ORCHARD HEALTH AND REHABILITATION

One email when it happens. No account; stop it any time with one click.

Which alerts

3 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities cited for sprinkler inspection and testing in CMS’s current file are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Emergency preparedness

2 of the 26 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

How that compares

Citations in CMS's current file

Compared with the median facility in GA, and nationally. Surveyors differ markedly between states, so the GA figure is the meaningful one.

This facility26GA median8National median11
Citations in CMS's current file, compared
MeasureCitations
This facility26
Median facility in GA8
Median facility nationally11

Survey history

Citations at each Life Safety survey
72023-02132025-0462026-07
Citations at each Life Safety survey
Survey dateCitations
February 26, 20237
April 3, 202513
July 16, 20266

Most-cited tags

Most-cited tags at this facility
K-03533K-02912K-07812K-09202K-05112K-03212K-03412K-09181
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0353Inspect, test, and maintain automatic sprinkler systems.32026-07-16
K-0291Install emergency lighting that can last at least 1 1/2 hours.22026-07-16
K-0781Have restrictions on the use of portable space heaters.22025-04-03
K-0920Ensure proper usage of power strips and extension cords.22025-04-03
K-0511Have properly installed electrical wiring and gas equipment.22026-07-16
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.22026-07-16
K-0341Install a fire alarm system that can be heard throughout the facility.22026-07-16
K-0918Have generator or other power source capable of supplying service within 10 seconds.12023-02-26

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 10
  • Egress Deficiencies 5
  • Miscellaneous Deficiencies 4
  • Gas, Vacuum, and Electrical Systems Deficiencies 3
  • Other 4
Citations by CMS category
CategoryCitations
Smoke Deficiencies10
Egress Deficiencies5
Miscellaneous Deficiencies4
Gas, Vacuum, and Electrical Systems Deficiencies3
Emergency Preparedness Deficiencies2
Services Deficiencies2

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

July 16, 2026 — 6 citations

Citations issued on July 16, 2026
TagWhat the surveyor checksStatus
K-0291Install emergency lighting that can last at least 1 1/2 hours.Deficient, Provider has date of correction (August 28, 2026)
K-0293Have properly located and lighted "Exit" signs.Deficient, Provider has date of correction (August 28, 2026)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (August 28, 2026)
K-0341Install a fire alarm system that can be heard throughout the facility.Deficient, Provider has date of correction (August 28, 2026)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (September 14, 2026)
K-0511Have properly installed electrical wiring and gas equipment.Deficient, Provider has date of correction (August 28, 2026)

April 3, 2025 — 13 citations

Citations issued on April 3, 2025
TagWhat the surveyor checksStatus
E-0026Establish roles under a Waiver declared by secretary.Deficient, Provider has date of correction (May 2, 2025)
E-0039Conduct testing and exercise requirements.Deficient, Provider has date of correction (May 2, 2025)
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (May 2, 2025)
K-0223Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector.Deficient, Provider has date of correction (May 2, 2025)
K-0291Install emergency lighting that can last at least 1 1/2 hours.Deficient, Provider has date of correction (May 2, 2025)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (May 2, 2025)
K-0341Install a fire alarm system that can be heard throughout the facility.Deficient, Provider has date of correction (May 2, 2025)
K-0351Install an approved automatic sprinkler system.Deficient, Provider has date of correction (May 2, 2025)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (May 2, 2025)
K-0355Properly select, install, inspect, or maintain portable fire extinguishes.Deficient, Provider has date of correction (May 2, 2025)
K-0511Have properly installed electrical wiring and gas equipment.Deficient, Provider has date of correction (May 2, 2025)
K-0781Have restrictions on the use of portable space heaters.Deficient, Provider has date of correction (May 2, 2025)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (May 2, 2025)

February 26, 2023 — 7 citations

Citations issued on February 26, 2023
TagWhat the surveyor checksStatus
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (April 11, 2023)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (April 11, 2023)
K-0700Meet requirements for operating features, such as evacuation plans, fire drills, smoking regulations, draperies, decorations and the inspection, testing and maintenance of fire doors.Deficient, Provider has date of correction (April 11, 2023)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (April 11, 2023)
K-0781Have restrictions on the use of portable space heaters.Deficient, Provider has date of correction (April 11, 2023)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (April 11, 2023)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (April 11, 2023)