Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

CHULIO HILLS HEALTH AND REHAB

ROME, GA · 100 certified beds · Last Life Safety survey December 18, 2025

CMS Certification Number 115287 · first certified December 1981

Ownership

Operated by RELIABLE HEALTH CARE MANAGEMENT · For profit - Limited Liability company

No change of ownership on CMS record since January 1, 2016, when the records begin.

5
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
0
Tags cited more than once
Across separate surveys
0
Inspection & testing records
Of the citations on file

Position within GA

5 citations — more than 23% of the 356 certified nursing homes in GA. Compared within GA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Improvingfewer citations at the latest survey than at its earlier surveys in the window.

The latest survey found 0 citations; the earlier surveys in the window averaged 2.5. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window opens February 2027 — about 5 months from now. This facility’s last Life Safety survey was December 2025. Facilities in GA are typically surveyed 14–20 months after the last one (median 16), measured over 532 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about CHULIO HILLS HEALTH AND REHAB

One email when it happens. No account; stop it any time with one click.

Which alerts

Emergency preparedness

2 of the 5 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

Physical environment (health survey)

3 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 5 Life Safety citations above. The Physical Environment Index

  • F-0880 Provide and implement an infection prevention and control program.
  • F-0921 Make sure that the nursing home area is safe, easy to use, clean and comfortable for residents, staff and the public.

How that compares

Citations on file over three years

Compared with the median facility in GA, and nationally. Surveyors differ markedly between states, so the GA figure is the meaningful one.

This facility5GA median8National median11
Citations on file over three years, compared
MeasureCitations
This facility5
Median facility in GA8
Median facility nationally11

Survey history

Citations at each Life Safety survey
32022-0522024-0802025-12
Citations at each Life Safety survey
Survey dateCitations
May 26, 20223
August 4, 20242
December 18, 20250

Most-cited tags

Most-cited tags at this facility
K-03621E-00391E-00041K-03741K-01111
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0362Ensure that corridors are separated from use areas by walls constructed to limit the passage of smoke.12024-08-04
E-0039Conduct testing and exercise requirements.12022-05-26
E-0004Develop and maintain an Emergency Preparedness Program (EP).12022-05-26
K-0374Install smoke barrier doors that can resist smoke for at least 20 minutes.12024-08-04
K-0111Satisfy building requirements after a repair, renovation, modification, or change of user/occupancy.12022-05-26

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 2
  • Emergency Preparedness Deficiencies 2
  • Construction Deficiencies 1
Citations by CMS category
CategoryCitations
Smoke Deficiencies2
Emergency Preparedness Deficiencies2
Construction Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

August 4, 2024 — 2 citations

Citations issued on August 4, 2024
TagWhat the surveyor checksStatus
K-0362Ensure that corridors are separated from use areas by walls constructed to limit the passage of smoke.Deficient, Provider has date of correction (September 9, 2024)
K-0374Install smoke barrier doors that can resist smoke for at least 20 minutes.Deficient, Provider has date of correction (September 9, 2024)

May 26, 2022 — 3 citations

Citations issued on May 26, 2022
TagWhat the surveyor checksStatus
E-0004Develop and maintain an Emergency Preparedness Program (EP).Deficient, Provider has date of correction (July 10, 2022)
E-0039Conduct testing and exercise requirements.Deficient, Provider has date of correction (July 10, 2022)
K-0111Satisfy building requirements after a repair, renovation, modification, or change of user/occupancy.Deficient, Provider has date of correction (July 10, 2022)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.