Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

Ennoble Nursing and Rehab

Dubuque, IA · 85 certified beds · Last Life Safety survey June 5, 2025

CMS Certification Number 165559 · first certified November 2005

Ownership

Operated by SHLOMO HOFFMAN · For profit - Limited Liability company

  • Ownership changed April 1, 2023 (change of ownership)from ENNOBLE NURSING LLC
10
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
1
Tags cited more than once
Across separate surveys
4
Inspection & testing records
Of the citations on file

Position within IA

10 citations — more than 34% of the 387 certified nursing homes in IA. Compared within IA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Improvingfewer citations at the latest survey than at its earlier surveys in the window.

The latest survey found 2 citations; the earlier surveys in the window averaged 4. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

Well past the typical window (April 2026 to July 2026), and past the point by which nine in ten IA facilities have been surveyed. This facility’s last Life Safety survey was June 2025. Facilities in IA are typically surveyed 11–13 months after the last one (median 12), measured over 700 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about Ennoble Nursing and Rehab

One email when it happens. No account; stop it any time with one click.

Which alerts

1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Emergency preparedness

2 of the 10 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

Physical environment (health survey)

1 physical-environment citation on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 10 Life Safety citations above. The Physical Environment Index

  • F-0880 Provide and implement an infection prevention and control program.

How that compares

Citations on file over three years

Compared with the median facility in IA, and nationally. Surveyors differ markedly between states, so the IA figure is the meaningful one.

This facility10IA median12National median11
Citations on file over three years, compared
MeasureCitations
This facility10
Median facility in IA12
Median facility nationally11

Survey history

Citations at each Life Safety survey
62023-0522024-0722025-06
Citations at each Life Safety survey
Survey dateCitations
May 18, 20236
July 18, 20242
June 5, 20252

Most-cited tags

Most-cited tags at this facility
K-03532K-02231K-09201E-00291K-02111E-00041K-03631K-05111
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0353Inspect, test, and maintain automatic sprinkler systems.22025-06-05
K-0223Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector.12025-06-05
K-0920Ensure proper usage of power strips and extension cords.12024-07-18
E-0029Develop a communication plan.12023-05-18
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.12023-05-18
E-0004Develop and maintain an Emergency Preparedness Program (EP).12023-05-18
K-0363Install corridor and hallway doors that block smoke.12023-05-18
K-0511Have properly installed electrical wiring and gas equipment.12023-05-18

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 4
  • Egress Deficiencies 2
  • Emergency Preparedness Deficiencies 2
  • Gas, Vacuum, and Electrical Systems Deficiencies 1
  • Other 1
Citations by CMS category
CategoryCitations
Smoke Deficiencies4
Egress Deficiencies2
Emergency Preparedness Deficiencies2
Gas, Vacuum, and Electrical Systems Deficiencies1
Services Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

June 5, 2025 — 2 citations

Citations issued on June 5, 2025
TagWhat the surveyor checksStatus
K-0223Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector.Deficient, Provider has date of correction (June 5, 2025)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (June 5, 2025)

July 18, 2024 — 2 citations

Citations issued on July 18, 2024
TagWhat the surveyor checksStatus
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (July 26, 2024)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (July 25, 2024)

May 18, 2023 — 6 citations

Citations issued on May 18, 2023
TagWhat the surveyor checksStatus
E-0004Develop and maintain an Emergency Preparedness Program (EP).Deficient, Provider has date of correction (May 30, 2023)
E-0029Develop a communication plan.Deficient, Provider has date of correction (May 30, 2023)
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Waiver has been granted (September 30, 2023)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (May 30, 2023)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (May 30, 2023)
K-0511Have properly installed electrical wiring and gas equipment.Deficient, Provider has date of correction (May 30, 2023)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.