Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
Promontory Point Rehabilitation
Ammon, ID · 50 certified beds · Last Life Safety survey May 28, 2026
CMS Certification Number 135137 · first certified October 2010
Ownership
Operated by PROMONTORY HEALTHCARE MANAGEMENT · For profit - Limited Liability company
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within ID
18 citations — more than 82% of the 80 certified nursing homes in ID. Compared within ID rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 7 citations; the earlier surveys in the window averaged 5.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens June 2027 — about 8 months from now. This facility’s last Life Safety survey was May 2026. Facilities in ID are typically surveyed 12–36 months after the last one (median 14), measured over 112 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about Promontory Point Rehabilitation
One email when it happens. No account; stop it any time with one click.
2 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
7 of the 18 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
2 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 18 Life Safety citations above. The Physical Environment Index
- F-0880 Provide and implement an infection prevention and control program.
How that compares
Compared with the median facility in ID, and nationally. Surveyors differ markedly between states, so the ID figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 18 |
| Median facility in ID | 9 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| March 8, 2024 | 8 |
| February 12, 2025 | 3 |
| May 28, 2026 | 7 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0511 | Have properly installed electrical wiring and gas equipment. | 2 | 2025-02-12 |
| K-0712 | Have simulated fire drills held at unexpected times. | 2 | 2026-05-28 |
| E-0024 | Establish policies and procedures for volunteers. | 2 | 2026-05-28 |
| K-0324 | Provide properly protected cooking facilities. | 1 | 2026-05-28 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 1 | 2024-03-08 |
| K-0522 | Have an externally vented heating system. | 1 | 2024-03-08 |
| E-0004 | Develop and maintain an Emergency Preparedness Program (EP). | 1 | 2024-03-08 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 1 | 2026-05-28 |
What the citations cover
- Emergency Preparedness Deficiencies 7
- Services Deficiencies 3
- Smoke Deficiencies 3
- Miscellaneous Deficiencies 3
- Other 2
| Category | Citations |
|---|---|
| Emergency Preparedness Deficiencies | 7 |
| Services Deficiencies | 3 |
| Smoke Deficiencies | 3 |
| Miscellaneous Deficiencies | 3 |
| Construction Deficiencies | 1 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
May 28, 2026 — 7 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0015 | Address subsistence needs for staff and patients. | Deficient, Provider has date of correction (August 25, 2025) |
| E-0024 | Establish policies and procedures for volunteers. | Deficient, Provider has date of correction (August 25, 2025) |
| E-0026 | Establish roles under a Waiver declared by secretary. | Deficient, Provider has date of correction (August 25, 2025) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (August 25, 2025) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (August 25, 2025) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (August 25, 2025) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (August 25, 2025) |
February 12, 2025 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0161 | Use approved construction type or materials. | Deficient, Provider has date of correction (September 5, 2024) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (September 5, 2024) |
| K-0791 | Ensure that any exit in an area undergoing construction, repair, or improvements shall be inspected daily to ensure its ability to be used instantly in case of emergency. | Deficient, Provider has date of correction (September 5, 2024) |
March 8, 2024 — 8 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0004 | Develop and maintain an Emergency Preparedness Program (EP). | Deficient, Provider has date of correction (September 6, 2023) |
| E-0009 | Include a process for Emergency Preparedness collaboration. | Deficient, Provider has date of correction (September 6, 2023) |
| E-0024 | Establish policies and procedures for volunteers. | Deficient, Provider has date of correction (September 6, 2023) |
| E-0029 | Develop a communication plan. | Deficient, Provider has date of correction (September 6, 2023) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (September 6, 2023) |
| K-0522 | Have an externally vented heating system. | Deficient, Provider has date of correction (September 6, 2023) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (September 6, 2023) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (September 6, 2023) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.