Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
Aspen Transitional Rehabilitation
Meridian, ID · 30 certified beds · Last Life Safety survey September 12, 2024
CMS Certification Number 135130 · first certified August 2005
Ownership
Operated by ADVANCED HEALTH CARE · For profit - Corporation
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within ID
8 citations — more than 38% of the 80 certified nursing homes in ID. Compared within ID rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 4 citations; the earlier surveys in the window averaged 2. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window is open now: September 2025 to September 2027. This facility’s last Life Safety survey was September 2024. Facilities in ID are typically surveyed 12–36 months after the last one (median 14), measured over 112 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about Aspen Transitional Rehabilitation
One email when it happens. No account; stop it any time with one click.
1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Physical environment (health survey)
2 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 8 Life Safety citations above. The Physical Environment Index
- F-0880 Provide and implement an infection prevention and control program.
How that compares
Compared with the median facility in ID, and nationally. Surveyors differ markedly between states, so the ID figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 8 |
| Median facility in ID | 9 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| September 6, 2019 | 4 |
| July 27, 2023 | 0 |
| September 12, 2024 | 4 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 2 | 2024-09-12 |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 1 | 2019-09-06 |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 1 | 2024-09-12 |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | 1 | 2024-09-12 |
| K-0100 | Meet other general requirements. | 1 | 2019-09-06 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 1 | 2024-09-12 |
| K-0914 | Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing. | 1 | 2019-09-06 |
What the citations cover
- Smoke Deficiencies 4
- Gas, Vacuum, and Electrical Systems Deficiencies 2
- Construction Deficiencies 1
- Egress Deficiencies 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 4 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 2 |
| Construction Deficiencies | 1 |
| Egress Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
September 12, 2024 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (July 5, 2024) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (July 5, 2024) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (July 5, 2024) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (July 5, 2024) |
September 6, 2019 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0100 | Meet other general requirements. | Deficient, Provider has date of correction (October 23, 2019) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (October 23, 2019) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (October 23, 2019) |
| K-0914 | Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing. | Deficient, Provider has date of correction (October 23, 2019) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.