Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

H & J VONDERLIETH LVG CTR, THE

MOUNT PULASKI, IL · 90 certified beds · Last Life Safety survey December 11, 2025

CMS Certification Number 146042 · first certified February 2003

Ownership

Operated by HERITAGE OPERATIONS GROUP · Non profit - Corporation

No change of ownership on CMS record since January 1, 2016, when the records begin.

13
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
2
Tags cited more than once
Across separate surveys
6
Inspection & testing records
Of the citations on file

Position within IL

13 citations — more than 44% of the 666 certified nursing homes in IL. Compared within IL rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Holding steadyabout the same at the latest survey as at its earlier surveys in the window.

The latest survey found 4 citations; the earlier surveys in the window averaged 4.5. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window opens November 2026 — about 1 month from now. This facility’s last Life Safety survey was December 2025. Facilities in IL are typically surveyed 11–13 months after the last one (median 12), measured over 759 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about H & J VONDERLIETH LVG CTR, THE

One email when it happens. No account; stop it any time with one click.

Which alerts

Physical environment (health survey)

1 physical-environment citation on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 13 Life Safety citations above. The Physical Environment Index

  • F-0880 Provide and implement an infection prevention and control program.

How that compares

Citations on file over three years

Compared with the median facility in IL, and nationally. Surveyors differ markedly between states, so the IL figure is the meaningful one.

This facility13IL median15National median11
Citations on file over three years, compared
MeasureCitations
This facility13
Median facility in IL15
Median facility nationally11

Survey history

Citations at each Life Safety survey
72023-0822024-0942025-12
Citations at each Life Safety survey
Survey dateCitations
August 3, 20237
September 12, 20242
December 11, 20254

Most-cited tags

Most-cited tags at this facility
K-03213K-09202K-07611K-07121K-03451K-03741K-09301K-09181
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.32025-12-11
K-0920Ensure proper usage of power strips and extension cords.22025-12-11
K-0761To conduct inspection, testing and maintenance of fire doors by qualified individuals.12024-09-12
K-0712Have simulated fire drills held at unexpected times.12025-12-11
K-0345Have approved installation, maintenance and testing program for fire alarm systems.12023-08-03
K-0374Install smoke barrier doors that can resist smoke for at least 20 minutes.12023-08-03
K-0930Ensure proper storage of liquid oxygen.12023-08-03
K-0918Have generator or other power source capable of supplying service within 10 seconds.12023-08-03

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 7
  • Gas, Vacuum, and Electrical Systems Deficiencies 4
  • Miscellaneous Deficiencies 2
Citations by CMS category
CategoryCitations
Smoke Deficiencies7
Gas, Vacuum, and Electrical Systems Deficiencies4
Miscellaneous Deficiencies2

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

December 11, 2025 — 4 citations

Citations issued on December 11, 2025
TagWhat the surveyor checksStatus
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (January 2, 2026)
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.Deficient, Provider has date of correction (January 2, 2026)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (January 2, 2026)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (January 2, 2026)

September 12, 2024 — 2 citations

Citations issued on September 12, 2024
TagWhat the surveyor checksStatus
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (September 24, 2024)
K-0761To conduct inspection, testing and maintenance of fire doors by qualified individuals.Deficient, Provider has date of correction (September 23, 2024)

August 3, 2023 — 7 citations

Citations issued on August 3, 2023
TagWhat the surveyor checksStatus
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (August 3, 2023)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (August 9, 2023)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (August 11, 2023)
K-0374Install smoke barrier doors that can resist smoke for at least 20 minutes.Deficient, Provider has date of correction (August 3, 2023)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (August 11, 2023)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (August 16, 2023)
K-0930Ensure proper storage of liquid oxygen.Deficient, Provider has date of correction (August 16, 2023)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.