Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
ADAMS WOODCREST
DECATUR, IN · 143 certified beds · Last Life Safety survey September 19, 2025
CMS Certification Number 155747 · first certified November 2005
Ownership
Independently operated (no chain recorded by CMS) · Government - City/county
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within IN
9 citations — more than 26% of the 507 certified nursing homes in IN. Compared within IN rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 2 citations; the earlier surveys in the window averaged 3.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window is open now: August 2026 to November 2026. This facility’s last Life Safety survey was September 2025. Facilities in IN are typically surveyed 11–14 months after the last one (median 13), measured over 883 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about ADAMS WOODCREST
One email when it happens. No account; stop it any time with one click.
1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
How that compares
Compared with the median facility in IN, and nationally. Surveyors differ markedly between states, so the IN figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 9 |
| Median facility in IN | 15 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| December 21, 2023 | 4 |
| November 27, 2024 | 3 |
| September 19, 2025 | 2 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0363 | Install corridor and hallway doors that block smoke. | 2 | 2025-09-19 |
| K-0920 | Ensure proper usage of power strips and extension cords. | 2 | 2024-11-27 |
| K-0911 | Meet requirements for the installation and maintenance of electrical systems. | 1 | 2023-12-21 |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 1 | 2023-12-21 |
| K-0226 | Have horizontal exits used in accordance with safety requirements. | 1 | 2024-11-27 |
| K-0324 | Provide properly protected cooking facilities. | 1 | 2025-09-19 |
| K-0293 | Have properly located and lighted "Exit" signs. | 1 | 2024-11-27 |
What the citations cover
- Smoke Deficiencies 4
- Gas, Vacuum, and Electrical Systems Deficiencies 3
- Egress Deficiencies 2
| Category | Citations |
|---|---|
| Smoke Deficiencies | 4 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 3 |
| Egress Deficiencies | 2 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
September 19, 2025 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (January 1, 2026) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (January 1, 2026) |
November 27, 2024 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0226 | Have horizontal exits used in accordance with safety requirements. | Deficient, Provider has date of correction (December 31, 2024) |
| K-0293 | Have properly located and lighted "Exit" signs. | Deficient, Provider has date of correction (December 31, 2024) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (December 31, 2024) |
December 21, 2023 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (April 5, 2024) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (April 5, 2024) |
| K-0911 | Meet requirements for the installation and maintenance of electrical systems. | Deficient, Provider has date of correction (April 5, 2024) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (April 5, 2024) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.