Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
GREENWOOD HEALTH AND LIVING COMMUNITY
GREENWOOD, IN · 111 certified beds · Last Life Safety survey April 16, 2026
CMS Certification Number 155412 · first certified December 1991
Ownership
Operated by CARDON & ASSOCIATES · For profit - Corporation
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within IN
17 citations — more than 57% of the 507 certified nursing homes in IN. Compared within IN rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 3 citations; the earlier surveys in the window averaged 7. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens March 2027 — about 6 months from now. This facility’s last Life Safety survey was April 2026. Facilities in IN are typically surveyed 11–14 months after the last one (median 13), measured over 883 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about GREENWOOD HEALTH AND LIVING COMMUNITY
One email when it happens. No account; stop it any time with one click.
1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
4 of the 17 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
1 physical-environment citation on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 17 Life Safety citations above. The Physical Environment Index
- F-0880 Provide and implement an infection prevention and control program.
How that compares
Compared with the median facility in IN, and nationally. Surveyors differ markedly between states, so the IN figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 17 |
| Median facility in IN | 15 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| May 13, 2024 | 9 |
| May 23, 2025 | 5 |
| April 16, 2026 | 3 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0916 | Have a battery powered remote alarm panel in a location accessible by operating personnel. | 2 | 2026-04-16 |
| K-0511 | Have properly installed electrical wiring and gas equipment. | 2 | 2026-04-16 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 1 | 2025-05-23 |
| E-0013 | Develop Emergency Preparedness policies and procedures. | 1 | 2024-05-13 |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | 1 | 2025-05-23 |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | 1 | 2024-05-13 |
| K-0920 | Ensure proper usage of power strips and extension cords. | 1 | 2024-05-13 |
| E-0006 | Conduct risk assessment and an All-Hazards approach. | 1 | 2024-05-13 |
What the citations cover
- Gas, Vacuum, and Electrical Systems Deficiencies 5
- Smoke Deficiencies 4
- Emergency Preparedness Deficiencies 4
- Services Deficiencies 2
- Other 2
| Category | Citations |
|---|---|
| Gas, Vacuum, and Electrical Systems Deficiencies | 5 |
| Smoke Deficiencies | 4 |
| Emergency Preparedness Deficiencies | 4 |
| Services Deficiencies | 2 |
| Miscellaneous Deficiencies | 1 |
| Egress Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
April 16, 2026 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (May 27, 2026) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (May 27, 2026) |
| K-0916 | Have a battery powered remote alarm panel in a location accessible by operating personnel. | Deficient, Provider has date of correction (May 27, 2026) |
May 23, 2025 — 5 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (July 11, 2025) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (July 11, 2025) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (July 11, 2025) |
| K-0911 | Meet requirements for the installation and maintenance of electrical systems. | Deficient, Provider has date of correction (July 11, 2025) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (July 11, 2025) |
May 13, 2024 — 9 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0004 | Develop and maintain an Emergency Preparedness Program (EP). | Deficient, Provider has date of correction (June 18, 2024) |
| E-0006 | Conduct risk assessment and an All-Hazards approach. | Deficient, Provider has date of correction (June 18, 2024) |
| E-0013 | Develop Emergency Preparedness policies and procedures. | Deficient, Provider has date of correction (June 18, 2024) |
| E-0041 | Implement emergency and standby power systems. | Deficient, Provider has date of correction (June 18, 2024) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (June 18, 2024) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (June 18, 2024) |
| K-0741 | Have posted "No-smoking" signs in areas where smoking is not permitted or ashtrays provided where smoking was allowed. | Deficient, Provider has date of correction (June 18, 2024) |
| K-0916 | Have a battery powered remote alarm panel in a location accessible by operating personnel. | Deficient, Provider has date of correction (June 18, 2024) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (June 18, 2024) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.