Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

SPRINGS OF MOORESVILLE, THE

MOORESVILLE, IN · 70 certified beds · Last Life Safety survey July 28, 2025

CMS Certification Number 155842 · first certified February 2016

Ownership

Operated by TRILOGY HEALTH SERVICES · Government - County

  • Ownership changed March 1, 2019 (change of ownership)to THE SPRINGS OF MOORESVILLE from RHS PARTNERS OF MOORESVILLE, LLC
4
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
0
Tags cited more than once
Across separate surveys
1
Inspection & testing records
Of the citations on file

Position within IN

4 citations — more than 10% of the 507 certified nursing homes in IN. Compared within IN rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Holding steadyabout the same at the latest survey as at its earlier surveys in the window.

The latest survey found 2 citations; the earlier surveys in the window averaged 1. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

Past the typical window (July 2026 to September 2026). Most IN facilities have been surveyed by October 2026. This facility’s last Life Safety survey was July 2025. Facilities in IN are typically surveyed 11–14 months after the last one (median 13), measured over 883 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about SPRINGS OF MOORESVILLE, THE

One email when it happens. No account; stop it any time with one click.

Which alerts

Emergency preparedness

1 of the 4 citations on file is Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

How that compares

Citations on file over three years

Compared with the median facility in IN, and nationally. Surveyors differ markedly between states, so the IN figure is the meaningful one.

This facility4IN median15National median11
Citations on file over three years, compared
MeasureCitations
This facility4
Median facility in IN15
Median facility nationally11

Survey history

Citations at each Life Safety survey
22023-0902024-0822025-07
Citations at each Life Safety survey
Survey dateCitations
September 26, 20232
August 21, 20240
July 28, 20252

Most-cited tags

Most-cited tags at this facility
K-09181E-00411K-01611K-03211
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0918Have generator or other power source capable of supplying service within 10 seconds.12023-09-26
E-0041Implement emergency and standby power systems.12023-09-26
K-0161Use approved construction type or materials.12025-07-28
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.12025-07-28

What the citations cover

Citations by CMS category
  • Construction Deficiencies 1
  • Gas, Vacuum, and Electrical Systems Deficiencies 1
  • Emergency Preparedness Deficiencies 1
  • Smoke Deficiencies 1
Citations by CMS category
CategoryCitations
Construction Deficiencies1
Gas, Vacuum, and Electrical Systems Deficiencies1
Emergency Preparedness Deficiencies1
Smoke Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

July 28, 2025 — 2 citations

Citations issued on July 28, 2025
TagWhat the surveyor checksStatus
K-0161Use approved construction type or materials.Deficient, Provider has date of correction (September 21, 2025)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (September 21, 2025)

September 26, 2023 — 2 citations

Citations issued on September 26, 2023
TagWhat the surveyor checksStatus
E-0041Implement emergency and standby power systems.Deficient, Provider has date of correction (October 24, 2023)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (October 24, 2023)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.