Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
MULBERRY HEALTH & REHABILITATION CENTER
MULBERRY, IN · 159 certified beds · Last Life Safety survey June 24, 2025
CMS Certification Number 155600 · first certified July 1996
Ownership
Independently operated (no chain recorded by CMS) · For profit - Limited Liability company
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within IN
16 citations — more than 52% of the 507 certified nursing homes in IN. Compared within IN rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 2 citations; the earlier surveys in the window averaged 7. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
Well past the typical window (June 2026 to August 2026), and past the point by which nine in ten IN facilities have been surveyed. This facility’s last Life Safety survey was June 2025. Facilities in IN are typically surveyed 11–14 months after the last one (median 13), measured over 883 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about MULBERRY HEALTH & REHABILITATION CENTER
One email when it happens. No account; stop it any time with one click.
Emergency preparedness
1 of the 16 citations on file is Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
How that compares
Compared with the median facility in IN, and nationally. Surveyors differ markedly between states, so the IN figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 16 |
| Median facility in IN | 15 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| February 17, 2023 | 12 |
| May 8, 2024 | 2 |
| June 24, 2025 | 2 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0920 | Ensure proper usage of power strips and extension cords. | 2 | 2024-05-08 |
| K-0363 | Install corridor and hallway doors that block smoke. | 1 | 2023-02-17 |
| K-0511 | Have properly installed electrical wiring and gas equipment. | 1 | 2023-02-17 |
| K-0293 | Have properly located and lighted "Exit" signs. | 1 | 2023-02-17 |
| K-0354 | Follow proper procedures when the automatic sprinkler systems was out of service for more than 10 hours. | 1 | 2023-02-17 |
| E-0041 | Implement emergency and standby power systems. | 1 | 2023-02-17 |
| K-0324 | Provide properly protected cooking facilities. | 1 | 2025-06-24 |
| K-0711 | Provide a written emergency evacuation plan. | 1 | 2023-02-17 |
What the citations cover
- Smoke Deficiencies 6
- Gas, Vacuum, and Electrical Systems Deficiencies 4
- Egress Deficiencies 3
- Services Deficiencies 1
- Other 2
| Category | Citations |
|---|---|
| Smoke Deficiencies | 6 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 4 |
| Egress Deficiencies | 3 |
| Services Deficiencies | 1 |
| Miscellaneous Deficiencies | 1 |
| Emergency Preparedness Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
June 24, 2025 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (July 24, 2025) |
| K-0921 | Ensure that testing and maintenance of electrical equipment is performed. | Deficient, Provider has date of correction (October 21, 2025) |
May 8, 2024 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (June 24, 2024) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (June 24, 2024) |
February 17, 2023 — 12 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0041 | Implement emergency and standby power systems. | Deficient, Provider has date of correction (April 14, 2023) |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (April 14, 2023) |
| K-0271 | Have exits that are accessible at all times. | Deficient, Provider has date of correction (April 14, 2023) |
| K-0293 | Have properly located and lighted "Exit" signs. | Deficient, Provider has date of correction (April 14, 2023) |
| K-0346 | Follow proper procedures when the fire alarm was out of service for more than 4 hours. | Deficient, Provider has date of correction (April 14, 2023) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (April 14, 2023) |
| K-0354 | Follow proper procedures when the automatic sprinkler systems was out of service for more than 10 hours. | Deficient, Provider has date of correction (April 14, 2023) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (April 14, 2023) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (April 14, 2023) |
| K-0711 | Provide a written emergency evacuation plan. | Deficient, Provider has date of correction (April 14, 2023) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (April 14, 2023) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (April 14, 2023) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.