Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
Cedar Ridge Health Campus
Cynthiana, KY · 53 certified beds · Last Life Safety survey January 22, 2026
CMS Certification Number 185145 · first certified September 1977
Ownership
Operated by TRILOGY HEALTH SERVICES · For profit - Corporation
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within KY
6 citations — more than 35% of the 267 certified nursing homes in KY. Compared within KY rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
When is the next survey likely?
The window opens March 2027 — about 5 months from now. This facility’s last Life Safety survey was January 2026. Facilities in KY are typically surveyed 14–59 months after the last one (median 28), measured over 391 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about Cedar Ridge Health Campus
One email when it happens. No account; stop it any time with one click.
How that compares
Compared with the median facility in KY, and nationally. Surveyors differ markedly between states, so the KY figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 6 |
| Median facility in KY | 7 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| February 9, 2024 | 6 |
| January 24, 2025 | 0 |
| January 22, 2026 | 0 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 1 | 2024-02-09 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 1 | 2024-02-09 |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 1 | 2024-02-09 |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | 1 | 2024-02-09 |
| K-0351 | Install an approved automatic sprinkler system. | 1 | 2024-02-09 |
| K-0920 | Ensure proper usage of power strips and extension cords. | 1 | 2024-02-09 |
What the citations cover
- Smoke Deficiencies 4
- Gas, Vacuum, and Electrical Systems Deficiencies 2
| Category | Citations |
|---|---|
| Smoke Deficiencies | 4 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 2 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
February 9, 2024 — 6 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (March 5, 2024) |
| K-0351 | Install an approved automatic sprinkler system. | Deficient, Provider has date of correction (April 1, 2024) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (April 1, 2024) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (March 5, 2024) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (March 5, 2024) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (March 5, 2024) |