Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
Greenville Nursing and Rehabilitation
Greenville, KY · 60 certified beds · Last Life Safety survey July 17, 2025
CMS Certification Number 185317 · first certified February 1992
Ownership
Operated by DAVID MARX · For profit - Limited Liability company
- Ownership changed August 30, 2019 (change of ownership)to GREENVILLE NURSING AND REHABILITATION LLC from DIVERSICARE OF GREENVILLE LLC
Position within KY
9 citations — more than 54% of the 267 certified nursing homes in KY. Compared within KY rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 3 citations; the earlier surveys in the window averaged 3. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window is open now: September 2026 to June 2030. This facility’s last Life Safety survey was July 2025. Facilities in KY are typically surveyed 14–59 months after the last one (median 28), measured over 391 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about Greenville Nursing and Rehabilitation
One email when it happens. No account; stop it any time with one click.
1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
How that compares
Compared with the median facility in KY, and nationally. Surveyors differ markedly between states, so the KY figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 9 |
| Median facility in KY | 7 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| May 2, 2019 | 0 |
| June 20, 2024 | 6 |
| July 17, 2025 | 3 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | 2 | 2025-07-17 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 1 | 2024-06-20 |
| K-0912 | Have power receptacles that are properly grounded. | 1 | 2024-06-20 |
| K-0293 | Have properly located and lighted "Exit" signs. | 1 | 2024-06-20 |
| K-0921 | Ensure that testing and maintenance of electrical equipment is performed. | 1 | 2024-06-20 |
| K-0712 | Have simulated fire drills held at unexpected times. | 1 | 2024-06-20 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 1 | 2025-07-17 |
| K-0923 | Have proper medical gas storage and administration areas. | 1 | 2025-07-17 |
What the citations cover
- Gas, Vacuum, and Electrical Systems Deficiencies 4
- Smoke Deficiencies 3
- Miscellaneous Deficiencies 1
- Egress Deficiencies 1
| Category | Citations |
|---|---|
| Gas, Vacuum, and Electrical Systems Deficiencies | 4 |
| Smoke Deficiencies | 3 |
| Miscellaneous Deficiencies | 1 |
| Egress Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
July 17, 2025 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (August 22, 2025) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (August 22, 2025) |
| K-0923 | Have proper medical gas storage and administration areas. | Deficient, Provider has date of correction (August 22, 2025) |
June 20, 2024 — 6 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0293 | Have properly located and lighted "Exit" signs. | Deficient, Provider has date of correction (July 18, 2024) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (July 18, 2024) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (July 18, 2024) |
| K-0912 | Have power receptacles that are properly grounded. | Deficient, Provider has date of correction (July 18, 2024) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (July 18, 2024) |
| K-0921 | Ensure that testing and maintenance of electrical equipment is performed. | Deficient, Provider has date of correction (July 18, 2024) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.